Jump to content

Bismarck Pack 3 - Stage 29


Recommended Posts

Adding the mast deck to the bridge

IMG_8749.thumb.jpg.f726fc2bc95e76e154f02c3e4b872ad1.jpg

 

The decking detail added:

IMG_8751.thumb.jpg.99e875bd451afda4f88b1971adf84ea3.jpg

 

The bridge windows are all put in as one piece:

IMG_8752.thumb.jpg.91620915ce68e430711750f1d00e843e.jpg

 

When I opened this stage the brown deck detail was already attached to the gray mast deck section, but on closer inspection it was on the wrong way around. Maybe it came together in transit? Anyway, check this. It came out ok and 

IMG_8753.thumb.jpg.9a61f266fa2f2b81840b200566eac4bf.jpgIMG_8754.thumb.jpg.04a5981d05d016f3cf619d6f12da883a.jpg

 

Here it is the correct way around:

IMG_8755.thumb.jpg.3b86a9539a0801852bf7cdbd02fc41d0.jpg

IMG_8758.thumb.jpg.8c799b40eb2fb71c0de45fef8d2a4c25.jpg

 

 

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...