Jump to content

T-800 Terminator Pack 2 - Stage 19


Recommended Posts

Stage 19, head motor:

Picture11.thumb.jpg.7446459d84bd8dd45e34fb1732abc427.jpg

 

The cog assembly and housing fit together, and I screw them in with 2 6mm screws:

Picture12.thumb.png.d84781f9198ae10e3587016f3e19e92b.png

 

I align the tabs on the motor with the sockets on the motor housing and screw them together with 2 5mm screws:

Picture13.jpg.443095890c01527e27a58db9b3b629cb.jpg

 

Now I make sure the peg on the cog assembly is rotated around before continuing, so it looks like this image:

Picture14.jpg.56db8e0484fcfe29be4150f5e2d2d5d1.jpg

 

I align the 3 screw holes on each assembly piece and join them together and screw them in with 3 6mm screws:

Picture15.thumb.png.db98ad42197fed7b0399930908efb059.png

 

Stage complete

Picture16.thumb.jpg.590c7d25196fbd1fea02229888a6bda4.jpg

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...