Administrator Mark, The Master Modeller Posted April 5 Administrator Share Posted April 5 Stage 63 gives us another section of hull, some reflective stickers and some other details. Let's start with the hull. Screw the bracket to the starboard side of the hull with a couple of screws. Fit the section of hull to the port side. It's fitted wiht one cross headed screw and one Allen screw. It looks like this from the outside. Taek the reflective sticker sheet and remove the windows to make life easier. Take the deck house from stage 51 and line the inside with the reflectivge stickers. These are best applied with tweezers. Screw the deck house to the boat deck with 4 screws fitted from underneath the boat deck. Take the third funnel and line the base with reflective stickers. Place a white foam sticker (supplied in stage 61) over the two middle LEDs. Now we need to fit the funnel assembly to the boat deck. Feed the two cables through the holes in the boat deck as shown. I secured the funnel to the boat deck with a couple of AP screws to stop it falling off and annoying me! Connect the lighting cable to sockets J1. The smoke generator cable is left loose for the moment. Now connect this LED circuit board to the adjacent board with the cable supplied in stage 54. Connect your test board and check that the LEDs all work. (sorry about the focus - I didn't notice it at the time) Also check that the lights in the funnel base also work. Take the dinghy tarpaulins and clip them on place on the dinghies by the first funnel. This completes the stage. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.