Jump to content

Pack 10 - Stage 53. Third funnel base.


Recommended Posts

  • Administrator

Stage 53 gives us the base (deck house) for the 3rd funnel and some vents.

PB220400.thumb.JPG.04f0c2768f45fb3aea31ed938d067a93.JPG

Take the ventilators B, D & F and glue them to the aft boat deck.

PB220401.thumb.JPG.78f6ddb5a5a6a09fd9096c575dc8d31c.JPG

Add ventilator A.

PB220402.thumb.JPG.f527e14a4a2abf67fc22ef6bc4ea508c.JPG

Add ventilator E.

PB220403.thumb.JPG.f7d4125008d687898399bd9a4ab2ef17.JPG

Add ventilator C.

PB220404.thumb.JPG.2164c222241268591dc539f03aca486d.JPG

Take the funnel base and clip the LED strip in place.

PB220405.thumb.JPG.3820f97bbf10fe069e8805d1b71698d9.JPG

Test it with the tester.

PB220406.thumb.JPG.7614e11cf3a06311960d3c51ab0a6027.JPG

Add the three small mushroom vents to the top of the deck house.

PB220407.thumb.JPG.3c7c7159fcb23a5d8868eb3052dfffe4.JPG

Take the grill 51I, supplies in stage 51, and glue it to the front of the deck house.

PB220408.thumb.JPG.c4af9b047bc37fa27267f005b87f86b4.JPG

Take 4 window frames from the brown fret supplied in stage 51 and glue these to the deck house.

PB220409.thumb.JPG.c55b0e28b6af6dfd68ceb4fbd9803d59.JPG

The instructions say to glue the orange pipe on place, but I suggest not gluing it until the funnel is fitted so you can be sure it sits neatly against the funnel.

This completes the stage.

PB220410.thumb.JPG.f9a7bd158f074b2f30113c53a26e7ff2.JPG

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...