Administrator Mark, The Master Modeller Posted November 22, 2023 Administrator Share Posted November 22, 2023 Stage 53 gives us the base (deck house) for the 3rd funnel and some vents. Take the ventilators B, D & F and glue them to the aft boat deck. Add ventilator A. Add ventilator E. Add ventilator C. Take the funnel base and clip the LED strip in place. Test it with the tester. Add the three small mushroom vents to the top of the deck house. Take the grill 51I, supplies in stage 51, and glue it to the front of the deck house. Take 4 window frames from the brown fret supplied in stage 51 and glue these to the deck house. The instructions say to glue the orange pipe on place, but I suggest not gluing it until the funnel is fitted so you can be sure it sits neatly against the funnel. This completes the stage. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.