Jump to content

Bismarck Pack 2 – stage 10


Recommended Posts

Stage 10: The second section of the upper deck

IMG_7756.thumb.JPG.a24cfcd8982d2e2814ed0ea85452fb0c.JPG

The four tabs on the barbette slot into place on the upper deck. You can see them here from the underside. It's then a good idea to test fit the front breakwater before gluing it as the tabs on the breakwater fit the four small slots, but also need to fit the longer recesses on either side. 

IMG_7757.thumb.JPG.73aa6eb6b1395ce1604013f4092d4664.JPGIMG_7759.thumb.JPG.37c198f73e17776b1a32bb8a07d18b65.JPG

Then all the deck details were added. The lines on the five skylights lie in the same direction as the lines on the deck. 

IMG_7763.thumb.JPG.763561af8a6387d1d26d4f73d458f569.JPG

IMG_7764.thumb.JPG.4afff9c709ea6f464480c8f624b60295.JPG

Stage 10 complete

IMG_7767.thumb.JPG.1335032d526006a5482872a8fb464b9a.JPG

In this image, the anchor chains have come off the capstans, but can easily be corrected at the next stage!

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...