Jump to content

Super Snake Pack 1 - Stage 2


Recommended Posts

Now for Stage 2 which is making a start on the left-hand door assembly. Again I’m loving the paintwork!IMG_5168.thumb.JPG.72eb4d1c941f47fe91e3306f36572a70.JPG104066812_pack2.png.b5c7b69ccf254190aa000c130e234747.png

 

 

The wing mirror slots through a hole on the door. It won’t line up properly with the screws on the back if it is in the wrong way (plus if it is in backwards its not going to look good!!😂)

1980305618_Picture1.png.febe54f7fadb503b76b42b0df8d53668.png666405957_screwindoor.jpg.61d2c26ce14c9da4782fc488c21f7ad0.jpg

 

Moving on to the door handle, which will now go onto the door loose, one MP02 screw is used to hold it on from the inside: 

847334605_doorhandle.png.34a5c78d8e787fdc3a1c5d0da85f9c12.png869267491_Picture2.png.542b367c6b777d34004f0f9c0e921043.png

 

 

door complete stage.png

 

 

 

 

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...