General Lou Posted October 16, 2020 Share Posted October 16, 2020 Stage 73, engine block, oil cooler and connection cable: I place the cylinder head assembly from stage 68 in the engine block. Then I turn it over and screw on the engine plate with 2 screws: Next, I press the filler pipe cap on to the filler pipe and then press it into a hole on the engine: Now I press the pressure probe in the engine nect to the filler pipe: Then I grab the connection cable and fix each end it to the front and back of the engine: Finally, I assemble the oil cooler and press the two lugs on the bottom into the two holes on the front of the radiator: Pack complete! Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.