Jump to content

Pack 4 - Stage 16. First class gym and stairwell.


Recommended Posts

  • Administrator

Stage 16 gives us the superstructure of the gym and stairwell, the decking and some ventilators.

PC140185.thumb.JPG.75888a2f08c4bd159aa54748c8b5f80f.JPG

The first task is the fit the decking.  As before, I used a glue stick to get a better bond.

PC140186.thumb.JPG.643e4377271df7ddf52cdfee262d454c.JPG

Fit the swan-necked vent to the rear of the superstructure section.  This is just a push fit.

PC140187.thumb.JPG.7f74fb2377aa4add09d502f624ed0d0e.JPG

Fit the cowled vent to the front starboard of the funnel base.

PC140188.thumb.JPG.f5f59e3af582fca3c4069a83c506a5e8.JPG

Finally, fit the other cowled vent to the front port side of the funnel base.

PC140189.thumb.JPG.797aefd46739416ed74b55cf5a77ba29.JPG

This completes the stage.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...