Administrator Mark, The Master Modeller Posted September 5, 2022 Administrator Share Posted September 5, 2022 Stage 11 gives us the first funnel. Push the springing the wick. Push this into the tank, spring end first. Take the smoke generator from issue 3 and fit it in the holder. Screw this to the funnel interior. Push the tank onto the smoke generator assembly. Don't glue it as you need to remove the funnel to fill the tank with water. Insert the funnel into the funnel plating, and I have to say, this plating looks fantastic. Fix it with 6 screws. Fit the stay collar to the funnel cap. This just pushes in place. Don't glue it. Now fit the funnel cap to the funnel. Note that the three holes int eh cap line up with the seam in the plating. Insert the smoke generator unit into the top of the funnel. Make sure that the wires come out of the hole in the bottom. Add the funnel grill. Don't glue it as you'll need to remove it to refill the smoke generator tank. This completes the stage. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.