Jump to content

Pack 7 - Stage 55. Fuselage frame.


Recommended Posts

  • Administrator

Stage 55 gives us the fuselage frame, and we install the tailwheel gearbox.

P8220810.thumb.JPG.1c6fa76c215b3c6146db286a3d9e28ff.JPG

Check that the fuselage frame is straight. It may have a slight bend, which is a quite common with flat stamped out parts.  A gentle easing should straighten it.  It doesn't need to be perfect as the outer frames of the fuselage assembly (supplied in stage 9) will pull it straight.

Fi the tail wheel assembly that was constructed in stage 53.  This is fixed with 2 screws.  Make sure you use the screws with the coarser thread as there are meant for plastic.  

P8220811.thumb.JPG.a8ad636403e66887fc9cb9dae5efdfcc.JPG

Push the servo into position in the gearbox.  It's just a push fit.

P8220812.thumb.JPG.da3a76a4647cd47104cdfb42479ba3ef.JPG

Now secure the gearbox assembly to the frame with 3 screws.  Make sure that it's fully located on the metal frame.

P8220813.thumb.JPG.6f86a0cfc2797c5015c8ffba7e834921.JPG

That completes this stage.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...