Jump to content

Pack 2 - Stage 8. Preparing the oil and water pump and assembling the cylinders.


Recommended Posts

  • Administrator

Stage 8 gives us a pile of cylinders and some pumps

P5160055.thumb.JPG.42b7692ea12a4d64eae8ac52538acd1a.JPG

The first task is to assemble the cylinders.  These can be pushed or glued together.  I chose to glue mine with superglue.

P5160056.thumb.JPG.a118ed32b41f45b533beb66bb26a355e.JPG

Push the two parts of the oil filter together.

P5160057.thumb.JPG.f27e7254fe5ecd7ad553d788c967d232.JPG

Push the two parts of the water pump together and fit the hoses.  I dipped a hose in boiling water (watch those fingers!) to remove the kink where is was bent in the plastic bag.  The hoses can be superglued in place, but I prefer to leave that until you can glue both ends as the hoses might need trimming to fit.

P5160058.thumb.JPG.c493ac626ffcb61112b951b3ecc3361e.JPG

Screw the water pump to the end of the engine block.

P5160059.thumb.JPG.b5b7ec932463cac1c53b2079bc1fd9de.JPG

Then screw the engine block to the gearbox.

P5160060.thumb.JPG.c3cdae902d705cdd20eeb91768de2f09.JPG

This completes stage 8.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...