Jump to content

Super Snake Pack 5 - Stage 34


Recommended Posts

Stage 34, pedals and interior walls:

1477712470_Picture1.png.9a7a8ac5519b17c00efaa77bf8bb7a44.png

 

I attach both walls to the floor. Each wall uses three screws, the first being an MP03:

1471040001_Picture2.png.a7404ff87d8171e9db1f617f12d238b3.png

 

Then I use 2 MP01 screws for the other holes:

1629195093_Picture3.png.6eb1ceeea57f2032eb3a4784dabf051a.png

 

Next, I put the switches in the switch holder. It doesn't matter which switch goes where as long as the button faces out from it:

1547239622_Picture4.png.83f4cba6516c9d449d6b7a08726d85fc.png

 

Now I hook the switch holder onto the floor and screw it in with an MP01 screw (the switches may be a little loose)

1477335141_Picture5.thumb.png.0781a918c7d6ec287c2ce3334621722e.png

 

Finally, I use two MP01 screws to attach the pedals. The pedals should be able to press the switches. If they don't, try loosening the pedal screws a little:

Stage complete

1876470019_Picture6.png.7364e3527fb60109e989e2ced385e238.png

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...