Jump to content

Titanic Pack 16 - Stage 92. Shelter deck bulkhead.


Recommended Posts

  • Administrator

Stage 92 gives us the bulkhead for the shelter deck.

P7240026.thumb.JPG.5610a85b01d3124f537036dfc87348ab.JPG

Glue the 4 white grilles in place.  

P7240028.thumb.JPG.b55efd150b74fe2a2d8fe497b1660a25.JPG

Screw the four connectors to the bulkhead.

P7240029.thumb.JPG.b2b002f4d2d3ebde40825e9ccf703d8a.JPG

Screw the bulkhead to the underside of the bridge deck.

P7240030.thumb.JPG.4f6164749c10e6fc336c5ad13b43ec60.JPG

It looks like this from the nice side.

P7240031.thumb.JPG.8ee1bb729fd13e3836374dccc09823fe.JPG

Clip the last LED board in place.

P7240032.thumb.JPG.296e5328bc337e0dba1dea1b4c1c15dd.JPG

Connect up the 5 LED boards with the previously supplied cables.  The instructions tell you which connectors to use.

P7240033.thumb.JPG.5aebdc6c40dd757890d920ad0224cc6d.JPG

Connect the tester to test all the LEDs.

P7240035.thumb.JPG.92412d791ffdc40aabfb3cb3379e50a5.JPG

There is one LED on the top of the deck to illuminate the deck house.

P7240036.thumb.JPG.af9a786a538d79ea230d0347a5224a28.JPG

And one LED to illuminate the stair case.

P7240037.thumb.JPG.589d4a2392b829ce2b5ce453de9627b1.JPG

This completes the stage and the Pack.

P7240039.thumb.JPG.decc8e977514285fd2245439736d1017.JPG

P7240039.thumb.JPG.decc8e977514285fd2245439736d1017.JPG

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...