Jump to content

Pack 12 - Stage 96. Infrared Receiver & pedestal.


Recommended Posts

  • Administrator

Stage 96 gives us the IR receiver unit and another piece of the pedestal.

P9181103.thumb.JPG.1746915085c6ddfe2ba742eb5f9c43be.JPG

Remove the two screws and the cover holder supplied in stage 89.

P9181104.thumb.JPG.19982504184dd50459106573727d17b7.JPG

Screw the IR receiver circuit board to the cover holder.

P9181105.thumb.JPG.efbdb1aea100d430f923ae084a1c46da.JPG

Replace the cover holder.

P9181106.thumb.JPG.6fce5286a3f84610f3e037947dc858af.JPG

Take the last section of pedestal base and put it in position.  It's secured with the metal plate.  The instructions advise adding this a little later on, but I found it more convenient to use it to hold the last section in place.  However, don't pick up the pedestal or you will bend the metal plate or damage the base.  

P9181107.thumb.JPG.7a1b27098f8aca2cc0959760242b5832.JPG

Add the side piece with the power switch, supplied in stage 71, and secure with the metal brackets supplied in stage 91.  

P9181108.thumb.JPG.259a89a4bcb5dcf965179dbfacb208bc.JPG

Screw the charging unit in place.  P9181109.thumb.JPG.3faa727fb1ab188ec77025bfd81a3581.JPG

It looks like this from the outside.  

P9181110.thumb.JPG.9c25d190aa1593dfcc9568b85e582e45.JPG

This completes the stage.  It will be OK to pick up the pedestal now as the base is supported buy both the metal plate and the side piece.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...