Jump to content

Pack 3, Stage 16


Recommended Posts

Pack 3, stage 16, preparing the chassis.

This stage has us start the front part of the chassis. Included in stage 16 is the front part of the frame, 2 brackets, a “bypass” and 2 lengths of hose along with the usual screws.

1.jpg.94a0f3da2b898b6657cba882f5451801.jpg

We start with the two brackets. The orientation on these is a bit difficult to figure out, and it took me a bit of trial-and-error fitting before I figured out how they were supposed to fit. Use 2x AM screws to secure the brackets to the chassis.

2.jpg.fe0a3a6950105d8d3a2f61e2e17c8e8c.jpg3.jpg.f06318d7528b706253aee3768d1557db.jpg

5.jpg.90430db0d8d5eb7b3a629f90f029156c.jpg

Next up is the bypass. There is only 1 way this will fit on, and the hoses need attention to be placed properly. The short hose is placed on top, while the longer hose exits the right side of the bypass.

6.jpg.78c1663390c9b9e32aab28a2006f2583.jpg7.jpg.e72d8a07dff0688ed977ad9f9e028961.jpg

Not much to this stage as we are done already!

4.jpg

Link to comment
Share on other sites

  • Mark A changed the title to Pack 3, Stage 16

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...