Jump to content

Super Snake Pack 6 - Stage 43


Recommended Posts

Stage 43, building up the interior walls:

1630246410_Picture1.png.11a0a7d55d7cb35b23dc74f23fb9cd66.png

 

The ventilation grill fits on nicely to the panel. Then I screw in with 2 MP01 screws on the back:

1925708967_Picture2.png.eb1a3596def5f952584e244b9d7f904a.png

 

Now this panel is ready to go on top of the previously attached panel. The two red circles are MP01, and the yellow smaller circle is an MP05:

2069333284_Picture3.thumb.png.40482472cf5390f095e267931810b12a.png

 

Stage complete

505202639_Picture4.png.e42274a1da2d9e8bdc942902fae365ed.png

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...