Jump to content

Pack 7 - Stage 54. Cockpit bulkhead.


Recommended Posts

  • Administrator

Stage 54 gives us the cockpit bulkhead.

P5170091.thumb.JPG.95b15aab499a59d2b251cfe61bbc84bf.JPG

Push the red and blue wires into the appropriate holes in the bulkhead.  They are a friction fit, but I decided to add a tiny drop of superglue in each hole, jus too be sure that they won't fall out.

P5170092.thumb.JPG.c6b4119e0ae4c9887f8974412d89484c.JPG

Push the voltage regulator in place.

P5170093.thumb.JPG.72546671803a13d3847ba26a949f36f0.JPG

Turn the bulkhead over and trim the wires flush with the bulkhead.

P5170094.thumb.JPG.7ba20afcca931915fd8f8f574dcacfa4.JPG

Fit the left tubular frame in place.  This is a push fit.

P5170095.thumb.JPG.5fea924168f9514f7b497707b2e5bcc5.JPG

Repeat with the right tubular frame.

P5170096.thumb.JPG.955fbfc1d3659c2a124d2537144f2fbd.JPG

This completes the stage, and the pack.  However, I couldn't resist trying the bulkhead in place!

P5170098.thumb.JPG.89b86b111357807b98be15256698071d.JPG

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...