Jump to content

Levelord

AgoraPro
  • Posts

    55
  • Joined

  • Last visited

  • Days Won

    1

Posts posted by Levelord

  1. Construction phase 22 - The right leaf spring

    Place the leaf spring and the two shackles in front of you and align them accordingly.
    Put a pin through the shackle and the leaf spring and carefully press the two together with a pair of pliers.Once both shackles have been installed, guide the leaf spring from below to the chassis and place the shackles in the holder.
    Screws the shackles from above with one MP01 screw each.
    Then we put the mounting plate over the leaf spring on the axle and fasten it with two MP05 screws.


    38783187bl.jpeg

    38783194cz.jpeg

    38783198az.jpeg

    38783201ge.jpeg

    38783208jh.jpeg

    38783211qc.jpeg

    38783226bs.jpeg

    38783230kw.jpeg

    38783232ib.jpeg

    38783237qp.jpeg

    38783240iy.jpeg

    • Like 1

  2. Construction phase 20 - The left leaf spring

    Place the leaf spring and the two shackles in front of you and align them accordingly.
    Put a pin through the shackle and the leaf spring and carefully press the two together with a pair of pliers.
    Once both shackles have been installed, guide the leaf spring from below to the chassis and place the shackles in the holder.Screws the shackles from above with one MP01 screw each.
    Then we put the mounting plate over the leaf spring on the axle and fasten it with two MP05 screws.


    38783127nx.jpeg

    38783128xn.jpeg

    38783135sd.jpeg

    38783142mz.jpeg

    38783146mo.jpeg

    38783150zi.jpeg

    38783151kt.jpeg

    38783157fj.jpeg

    38783160eq.jpeg

    38783162pa.jpeg

    38783164pe.jpeg

    38783166ke.jpeg

    38783173xt.jpeg


  3. Phase 18 - The top of the rear axle

    Now we put the differential housing in the lower part of the axle and then put the upper part of the axle on.
    We screw both parts with four MP01 screws.
    Then we put a spring on each of the two assembly pins and then guide the axle to the chassis as shownran.
    Screws the axle from the inside with one MP04 screw each.


    38783020wl.jpeg

    38783024sf.jpeg

    38783029ms.jpeg

    38783037jf.jpeg

    38783049hh.jpeg

    38783059ch.jpeg

    38783063jb.jpeg

    38783067jb.jpeg

    38783075so.jpeg

    38783089fw.jpeg

  4. Construction phase 09 - The right door trim


    Take the inner lining and insert the lower chrome strip. We fasten it from the inside with two MP01 screws.
    Then we insert the inner door handle into the mounting plate.
    We then insert both together from behind into the inner cladding as shown and screw the mounting plate with two MP02 screws.
    We fasten the door handle with an MP03 screw.
    Now we take the window crank and put it in the door panel. From the inside we screw it together with an MP02 screw.

    Then take the inner panel and insert it inside the door so that the mounting holes are aligned.
    Fasten the panel with two MD06 screws.
    Finally, we carefully insert the upper chrome strip, which is only inserted.


    38523774dm.jpeg

    38523794rq.jpeg

    38523809rn.jpeg

    38523820cb.jpeg

    38523832pn.jpeg

    38523834rh.jpeg

    38523842kx.jpeg

    38523846of.jpeg

    38523847lr.jpeg

    38523851em.jpeg

    38523852yu.jpeg

    38523855po.jpeg

    38523856ww.jpeg

    38523863lb.jpeg

  5. Construction phase 08 - The right door window


    It continues with the side window of the right door.
    Place the door on a soft cloth so that it does not get scratched.
    Then you lead the window pane from the inside to the door as shown and screw it with three MD05 screws.
    Now the door hinge follows, we put it in the door as shown and put the mounting plate on it.
    We then screw everything together with an MD06 screw.


    38523706he.jpeg

    38523709jy.jpeg

    38523712rb.jpeg

    38523718vi.jpeg

    38523738vu.jpeg

    38523740rh.jpeg

    38523756ro.jpeg

    38523769fj.jpeg

  6. Construction phase 4 - the left door panel

    We take the lower chrome strip and insert it into the door trim at the bottom. From the inside we screw both with two MP01 screws.
    Then we put the inner door handle in the holding plate and guide both into the door panel. The holding plate is attached with two MP02 screws, the handle itself we attach with an MP03 screw.
    The window crank is now also attached from the outside and screwed from the inside, for this we take an MP02 screw.
    Now the door trim is placed on the inside of the door and fixed with two MD06 screws.This is followed by the upper chrome strip, which we guide diagonally from above behind the door handle and then carefully fix it.


    37741318nd.jpeg

    37741356cr.jpeg

    37741370ws.jpeg

    37741376el.jpeg

    37741386xh.jpeg

    37741398wx.jpeg

    37741418yv.jpeg

    37741445hu.jpeg

    37741483zo.jpeg

    37741496yx.jpeg

    37741514bh.jpeg

    37741543ud.jpeg

    37741552ud.jpeg

    37741557zq.jpeg

    37741581rh.jpeg

  7. Hello everybody,

    In this construction diary I would like to show you how to build the GT500 Super Snake from the new partwork provider Agora Model.I hope you enjoy it. Comments are welcome.Lg Sascha

    Construction phase 1 - the front

    To start with, the quality of the components and the paintwork have been really great so far. I am particularly looking forward to the model's whitewall tires.First we take the front and put it on a soft cloth. From the inside we then lead the grille to the front and screw it together with two MD02 screws.Then we turn the front and attach the bumper from the front. Make sure that the indicated bumpers point upwards.From the inside we screw the bumper with two MP01 screws.Now we insert the headlights from the outside and screw them together with an MD01 screw.


    37740813iz.jpeg

    37740817vo.jpeg

    37740838xj.jpeg

    37740832je.jpeg

    37740851fq.jpeg

    37740865mo.jpeg

    37740871wt.jpeg

    37740892qw.jpeg

    37740895ri.jpeg

    37740907hh.jpeg

    37740960io.jpeg

    37740975pp.jpeg

×
×
  • Create New...