Jump to content

Levelord

AgoraPro
  • Posts

    55
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by Levelord

  1. Construction phase 65 - The cooler (1) Now it goes to the engine. First take the cooler and put the grille on it from the front. Then the fan wheel is inserted from the front and fastened from the rear with an MP01 screw. [img]https://up.picr.de/40380309ws.jpeg[/img] [img]https://up.picr.de/40380318zh.jpeg[/img] [img]https://up.picr.de/40380320qm.jpeg[/img] [img]https://up.picr.de/40380322sm.jpeg[/img] [img]https://up.picr.de/40380321lp.jpeg[/img] ----------------------------------------------------------------------------------------------- Construction phase 66 - cooler housing and fan wheel Now place the cooler housing on the cooler from the front and screw it with four MP01 screws. [img]https://up.picr.de/40380324sx.jpeg[/img] [img]https://up.picr.de/40380326kr.jpeg[/img] [img]https://up.picr.de/40380329qj.jpeg[/img] [img]https://up.picr.de/40380327yf.jpeg[/img] -------------------------------------------------------------------------------------------------- Construction phase 67 - Front radiator Now put the cover for the coolant on the top of the cooler and fasten it with a MP02 screw. The upper part is then plugged into the component made of BP66. The front half of the cooler is now also plugged in and screwed together with the grille. [img]https://up.picr.de/40380345hn.jpeg[/img] [img]https://up.picr.de/40380349xs.jpeg[/img] [img]https://up.picr.de/40380353la.jpeg[/img] [img]https://up.picr.de/40380352jk.jpeg[/img] [img]https://up.picr.de/40380354xl.jpeg[/img] [img]https://up.picr.de/40380355gf.jpeg[/img] [img]https://up.picr.de/40380367vx.jpeg[/img] [img]https://up.picr.de/40380360jv.jpeg[/img] [img]https://up.picr.de/40380364wz.jpeg[/img] ------------------------------------------------------------------------------------------------- Construction phase 68 - The engine (1) At the base of the air filter we insert the air filter into the groove and then guide the upper part of the air filter on it. Screwed everything together with two MP01 screws. Now place the carburetor on the air filter from below and mount it with two MP01 screws. Now guide the assembly onto the cylinder head and screw both from the inside. The valve covers are then placed on the side and screwed together with two MD06 screws each. [img]https://up.picr.de/40380370db.jpeg[/img] [img]https://up.picr.de/40380372gt.jpeg[/img] [img]https://up.picr.de/40380373gg.jpeg[/img] [img]https://up.picr.de/40380374ri.jpeg[/img] [img]https://up.picr.de/40380375wv.jpeg[/img] [img]https://up.picr.de/40380377lw.jpeg[/img] [img]https://up.picr.de/40380383ht.jpeg[/img] [img]https://up.picr.de/40380385mg.jpeg[/img] [img]https://up.picr.de/40380386lu.jpeg[/img] [img]https://up.picr.de/40380387ew.jpeg[/img] [img]https://up.picr.de/40380388rg.jpeg[/img] [img]https://up.picr.de/40380390qg.jpeg[/img] ------------------------------------------------------------------------------------------------------ Construction phase 69 - The engine (2) Now insert the bracket into the housing and screw it in with two MD06 screws. We then plug in the short tube at the top of the housing. Then we take the blue pressure pump and put it on the mounting plate. Then mount the retaining plate on the right of the case, for this we use an MP01 screw. [img]https://up.picr.de/40380392am.jpeg[/img] [img]https://up.picr.de/40380398tc.jpeg[/img] [img]https://up.picr.de/40380404jg.jpeg[/img] [img]https://up.picr.de/40380405nn.jpeg[/img] [img]https://up.picr.de/40380406uc.jpeg[/img] [img]https://up.picr.de/40380409dv.jpeg[/img] [img]https://up.picr.de/40380411jk.jpeg[/img] [img]https://up.picr.de/40380414wq.jpeg[/img] [img]https://up.picr.de/40380416xd.jpeg[/img] [img]https://up.picr.de/40380417zh.jpeg[/img] [img]https://up.picr.de/40380419oy.jpeg[/img] ------------------------------------------------------------------------------------------------------- Construction phase 70 - The engine (3) Now put the two halves of the generator together. We also put the two halves of the radiator hose on each other. Then mount the generator on the front housing. From the front we then put the pulleys on the housing and then the fan wheel. Screws the fan wheel from the inside with an MP01 screw. We attach the radiator hose to the top of the radiator. [img]https://up.picr.de/40380442gx.jpeg[/img] [img]https://up.picr.de/40380443ng.jpeg[/img] [img]https://up.picr.de/40380444hq.jpeg[/img] [img]https://up.picr.de/40380446cn.jpeg[/img] [img]https://up.picr.de/40380449bj.jpeg[/img] [img]https://up.picr.de/40380453fp.jpeg[/img] [img]https://up.picr.de/40380458sv.jpeg[/img] [img]https://up.picr.de/40380462cm.jpeg[/img] [img]https://up.picr.de/40380465dd.jpeg[/img] [img]https://up.picr.de/40380466vq.jpeg[/img] [img]https://up.picr.de/40380467kv.jpeg[/img] [img]https://up.picr.de/40380468cn.jpeg[/img] [img]https://up.picr.de/40380470tn.jpeg[/img] [img]https://up.picr.de/40380471fa.jpeg[/img] ------------------------------------------------------------------------------------------------------- Construction phase 71 - The engine (4) First mount the exhaust filter on the right engine block. Then take the exhaust manifold and plug the four Exhaust pipes as designated a. Now the light switch for the model is inserted from behind and with the mounting plate and a screw MP03 attached. [img]https://up.picr.de/40380473wx.jpeg[/img] [img]https://up.picr.de/40380482gg.jpeg[/img] [img]https://up.picr.de/40380490pj.jpeg[/img] [img]https://up.picr.de/40380491kh.jpeg[/img] [img]https://up.picr.de/40380492ld.jpeg[/img] [img]https://up.picr.de/40380493cl.jpeg[/img] [img]https://up.picr.de/40380494is.jpeg[/img] [img]https://up.picr.de/40380495bs.jpeg[/img] [img]https://up.picr.de/40380497wp.jpeg[/img] [img]https://up.picr.de/40380498lz.jpeg[/img] --------------------------------------------------------------------------------------------------------------- Construction phase 72 - The engine (5) Now take the left exhaust manifold and insert the four exhaust pipes there one after the other. Then pull out the assembly with the fan wheel again and plug it into the left engine block. The upper part of the gearbox is also plugged into the engine block. Now lead the right engine block to the left and screw both halves together with four MD06 screws. The exhaust pipes are then inserted on the sides of the engine block as shown. At the end of this construction phase, mount the retaining plate on the cooler, this is just clipped on. [img]https://up.picr.de/40380510wm.jpeg[/img] [img]https://up.picr.de/40380512eb.jpeg[/img] [img]https://up.picr.de/40380514nr.jpeg[/img] [img]https://up.picr.de/40380518aa.jpeg[/img] [img]https://up.picr.de/40380524gi.jpeg[/img] [img]https://up.picr.de/40380526pc.jpeg[/img] [img]https://up.picr.de/40380528oz.jpeg[/img] [img]https://up.picr.de/40380529ko.jpeg[/img] [img]https://up.picr.de/40380531tu.jpeg[/img] [img]https://up.picr.de/40380532ig.jpeg[/img] [img]https://up.picr.de/40380537bs.jpeg[/img] [img]https://up.picr.de/40380539kc.jpeg[/img] [img]https://up.picr.de/40380541xk.jpeg[/img] --------------------------------------------------------------------------------------------------------------- Construction phase 73 - The engine (6) Now guide the cylinder head to the engine block and insert it. The lower engine cover is then put on from below and everything is screwed together with two MD06 screws. Then insert the filler neck into the cover and then insert the nozzle on top of the engine. The connection cable is then led around the side of the air filter and plugged in at the positions. Now we take the components of the oil cooler and put them together. Screwed the small grid with four MP07 screws. Then plug the oil cooler in front of the cooler. [img]https://up.picr.de/40380689qh.jpeg[/img] [img]https://up.picr.de/40380691ef.jpeg[/img] [img]https://up.picr.de/40380694ww.jpeg[/img] [img]https://up.picr.de/40380696wk.jpeg[/img] [img]https://up.picr.de/40380697ue.jpeg[/img] [img]https://up.picr.de/40380703ok.jpeg[/img] [img]https://up.picr.de/40380706nv.jpeg[/img] [img]https://up.picr.de/40380714tb.jpeg[/img] [img]https://up.picr.de/40380717pk.jpeg[/img] [img]https://up.picr.de/40380720dm.jpeg[/img] [img]https://up.picr.de/40380737jl.jpeg[/img] [img]https://up.picr.de/40380742gv.jpeg[/img] [img]https://up.picr.de/40380744tb.jpeg[/img] [img]https://up.picr.de/40380751og.jpeg[/img] [img]https://up.picr.de/40380755en.jpeg[/img] [img]https://up.picr.de/40380756ym.jpeg[/img]
  2. Construction phase 56 - Rear left shock absorber and brake Take the cylinder of the shock absorber and put it in the base plate, fasten both together by pushing the pin through the opening to fix it. Then we insert the component from below into the chassis at the rear right and screw it together from above an MP01 screw. We then insert the upper end of the shock absorber into the cylinder and screw it to the Leaf spring holder, again with an MP01 screw. [img]https://up.picr.de/40349356kh.jpeg[/img] [img]https://up.picr.de/40349373ml.jpeg[/img] [img]https://up.picr.de/40349353mr.jpeg[/img] [img]https://up.picr.de/40349354ur.jpeg[/img] [img]https://up.picr.de/40349355zk.jpeg[/img] -------------------------------------------------------------------------------------------------------- Construction phase 57 - The left rear wheel Now we heat some water and put the tire there for about 1-2 minutes. SO the rubber becomes softer. Take the tire out of the water bath and carefully press the rim into the tire until it is properly seated. Turns the wheel around and applies the brake to the wheel hub from behind. Now guide the wheel and brake to the model and mounts the wheel on the axle with an MP03 screw. Finally, the hub cover is put on. [img]https://up.picr.de/40349358bw.jpeg[/img] [img]https://up.picr.de/40349361wu.jpeg[/img] [img]https://up.picr.de/40349363ou.jpeg[/img] [img]https://up.picr.de/40349364gk.jpeg[/img] [img]https://up.picr.de/40349365rh.jpeg[/img] [img]https://up.picr.de/40349366es.jpeg[/img] [img]https://up.picr.de/40349367ql.jpeg[/img] [img]https://up.picr.de/40349368zy.jpeg[/img] -------------------------------------------------------------------------------------------------------- Construction phase 58 - Rear right shock absorber and brake Now insert the cylinder of the shock absorber into the base plate and fasten both again with the pin. Then the component is inserted again from below on the model and from above with an MP01 screw screwed. Now insert the upper end of the shock absorber into the cylinder and screw it down with an MP03 screw on the bracket of the leaf spring. We only need the brake when we have finished the right wheel. [img]https://up.picr.de/40349370tb.jpeg[/img] [img]https://up.picr.de/40349371fa.jpeg[/img] [img]https://up.picr.de/40349373ml.jpeg[/img] [img]https://up.picr.de/40349372bu.jpeg[/img] [img]https://up.picr.de/40349374of.jpeg[/img] [img]https://up.picr.de/40349375em.jpeg[/img] -------------------------------------------------------------------------------------------------------- Construction phase 59 - The right rear wheel Now briefly heat the tire again in a water bath and then press it onto the rim. We put the brake on the wheel hub from behind and then guide the wheel to the model. Screw the wheel to the axle with an MP03 screw and finally put the wheel hub on. [img]https://up.picr.de/40349360jh.jpeg[/img] [img]https://up.picr.de/40349361wu.jpeg[/img] [img]https://up.picr.de/40349363ou.jpeg[/img] [img]https://up.picr.de/40349376zw.jpeg[/img] [img]https://up.picr.de/40349378qp.jpeg[/img] [img]https://up.picr.de/40349381gr.jpeg[/img] [img]https://up.picr.de/40349382gn.jpeg[/img] [img]https://up.picr.de/40349383bw.jpeg[/img] ------------------------------------------------------------------------------------------------------ Construction phase 60 - the exhaust system In order to be able to mount the exhaust system, we unfortunately have to dismantle a plate from the chassis. For this we remove the necessary screws and put everything aside. Then insert the exhaust system made of BP54 from below behind the axle and screw it to the chassis six MP01 screws on the chassis. Then put the base plate back in and screw it down as usual. Now we take the components of this construction phase. First place the halves of the silencer on the appropriate one Opposite side and screw them with two MP02 screws each. Then attach the exhaust pipes to the chassis from below and insert the ends into the tailpipes. Then screw everything to the chassis with four MP01 screws. [img]https://up.picr.de/40349384xt.jpeg[/img] [img]https://up.picr.de/40349388fg.jpeg[/img] [img]https://up.picr.de/40349391mi.jpeg[/img] [img]https://up.picr.de/40349394yd.jpeg[/img] [img]https://up.picr.de/40349392fo.jpeg[/img] [img]https://up.picr.de/40349393qy.jpeg[/img] [img]https://up.picr.de/40349395tv.jpeg[/img] -------------------------------------------------------------------------------------------------------- Construction phase 61 - the steering wheel Put the handlebar on the pinion and press it tight. Now guide the microswitch for the horn into the handlebar cover and press it firmly. Place the handlebar in the shaft and lay the cable sideways past it. Now assemble the second half the handlebar cover. Now press the steering wheel from the front onto the handlebar and mount the horn button. [img]https://up.picr.de/40349397fy.jpeg[/img] [img]https://up.picr.de/40349400lt.jpeg[/img] [img]https://up.picr.de/40349404zf.jpeg[/img] [img]https://up.picr.de/40349405si.jpeg[/img] [img]https://up.picr.de/40349406qw.jpeg[/img] [img]https://up.picr.de/40349407of.jpeg[/img] [img]https://up.picr.de/40349409xe.jpeg[/img] ----------------------------------------------------------------------------------------------------- Construction phase 62 - The trunk lining There is nothing to build in this construction phase. [img]https://up.picr.de/40349412zl.jpeg[/img] -------------------------------------------------------------------------------------------------------- Construction phase 63 - The spare wheel First, put the tire briefly in warm water to soften it. Pushes the tire then on the rim. Now guide the steering wheel through the cockpit from the inside and mount it with the bracket from the rear of the cockpit. Aligns the front wheels in the direction of travel and places the pinion of the handlebar on the pinion of the steering. Then press the mounting plate onto the pinion. Now we mount the interior on the chassis. Screw this with four MP01 screws from below. [img]https://up.picr.de/40349410xm.jpeg[/img] [img]https://up.picr.de/40349411lt.jpeg[/img] [img]https://up.picr.de/40349414uo.jpeg[/img] [img]https://up.picr.de/40349416dn.jpeg[/img] ---------------------------------------------------------------------------------------------------------- Construction phase 64 - Spare wheel holder and side parts of the trunk lining Now pull out the trunk lining made of BP62 again and attach the side panels to it. Now guide the panels onto the model from behind as shown and insert it. Now mount the bracket on the spare wheel and then insert it in the rear right in the body. [img]https://up.picr.de/40349419oi.jpeg[/img] [img]https://up.picr.de/40349420ay.jpeg[/img] [img]https://up.picr.de/40349421zp.jpeg[/img] [img]https://up.picr.de/40349422kn.jpeg[/img] [img]https://up.picr.de/40349423hd.jpeg[/img] [img]https://up.picr.de/40349425ez.jpeg[/img] [img]https://up.picr.de/40349427sh.jpeg[/img] [img]https://up.picr.de/40349426gb.jpeg[/img] [img]https://up.picr.de/40349430jv.jpeg[/img] [img]https://up.picr.de/40349431qg.jpeg[/img] [img]https://up.picr.de/40349432kp.jpeg[/img]
  3. Construction phase 47 - The right rear inside Now first mount the ashtray in the inner lining and screw it to one from behind MP01 screw. Then the door opener is inserted and also from behind with an MP01 screw screwed. Now we bring the interior lining up to the model as shown in the pictures and assemble it with three MP01 screws. Then we insert the foldable backrest into the holes with the pins on the side, as you can see. It recommends the screws on a side panel can be easily loosened for insertion and then tightened again. [img]https://up.picr.de/39639151bm.jpeg[/img] [img]https://up.picr.de/39639152am.jpeg[/img] [img]https://up.picr.de/39639153je.jpeg[/img] [img]https://up.picr.de/39639154gy.jpeg[/img] [img]https://up.picr.de/39639155jv.jpeg[/img] [img]https://up.picr.de/39639156qw.jpeg[/img] [img]https://up.picr.de/39639157mj.jpeg[/img] [img]https://up.picr.de/39639158gp.jpeg[/img] [img]https://up.picr.de/39639159zi.jpeg[/img] [img]https://up.picr.de/39639161rg.jpeg[/img] ------------------------------------------------------------------- Construction phase 48 - The upper rear inner panel First insert the chrome strip and screw it on with two MP01 screws. Then we lead the inner lining to the already assembled inner lining And screw both together. For this we take two MP01 screws and one MP05 screw. [img]https://up.picr.de/39639163xb.jpeg[/img] [img]https://up.picr.de/39639164vn.jpeg[/img] [img]https://up.picr.de/39639165da.jpeg[/img] [img]https://up.picr.de/39639166zf.jpeg[/img] [img]https://up.picr.de/39639167wb.jpeg[/img] [img]https://up.picr.de/39639168iy.jpeg[/img] [img]https://up.picr.de/39639169ib.jpeg[/img] [img]https://up.picr.de/39639170vw.jpeg[/img] ----------------------------------------------------------- Construction phase 49 - roll bars and belts Now take the heater and insert it from behind on the dashboard. Screw this with two screws MP01. Then you take the straps and insert them into the holders, fold the metal bracket around them no longer dissolve. Then screw the brackets to the roll bar with one MP05 screw each. Then insert the roll bar on the model as shown, paying attention to the alignment of the belts. Screws the roll bar to the chassis with two MP05 screws. You then pull the open ends of the straps through the floor and fasten the metal bracket with something Superglue. Now move the belts over the seats. [img]https://up.picr.de/39639172mk.jpeg[/img] [img]https://up.picr.de/39639173bu.jpeg[/img] [img]https://up.picr.de/39639175cb.jpeg[/img] [img]https://up.picr.de/39639176ck.jpeg[/img] [img]https://up.picr.de/39639177gw.jpeg[/img] [img]https://up.picr.de/39639179hl.jpeg[/img] [img]https://up.picr.de/39639180gu.jpeg[/img] [img]https://up.picr.de/39639181tu.jpeg[/img] [img]https://up.picr.de/39639182qb.jpeg[/img] [img]https://up.picr.de/39639183fg.jpeg[/img] [img]https://up.picr.de/39639185cf.jpeg[/img] ------------------------------------------------------------------- Construction phase 50 - the back seat and seat belts Now guide the two good guys with the belt buckles from above through the rear seat bench as shown and attach the small metal bracket from below, a little superglue helps here too. The other two straps are laid to the side and also attached below. Then insert the rear seat bench into the model and carefully press it down. screwed the Rear seat from below with four MP01 screws. [img]https://up.picr.de/39639186ob.jpeg[/img] [img]https://up.picr.de/39639188bl.jpeg[/img] [img]https://up.picr.de/39639189ml.jpeg[/img] [img]https://up.picr.de/39639191me.jpeg[/img] [img]https://up.picr.de/39639192iv.jpeg[/img] [img]https://up.picr.de/39639193de.jpeg[/img] [img]https://up.picr.de/39639194jx.jpeg[/img] [img]https://up.picr.de/39639195ba.jpeg[/img] [img]https://up.picr.de/39639196sg.jpeg[/img] ------------------------------------------------------------------- Phase 51 - The rear backrest and platform First place the two platform components together and then place them on the model. Bolt the platform from below with two MP01 bolts. then we insert the brackets of the backrest from above and screw them together from below with one MP05 screw each. [img]https://up.picr.de/39639197an.jpeg[/img] [img]https://up.picr.de/39639198uo.jpeg[/img] [img]https://up.picr.de/39639199ow.jpeg[/img] [img]https://up.picr.de/39639200hz.jpeg[/img] [img]https://up.picr.de/39639201qr.jpeg[/img] [img]https://up.picr.de/39639202rd.jpeg[/img] [img]https://up.picr.de/39639203zn.jpeg[/img] [img]https://up.picr.de/39639204gu.jpeg[/img] [img]https://up.picr.de/39639205vn.jpeg[/img] [img]https://up.picr.de/39639206cu.jpeg[/img] ---------------------------------------------------------------------- Construction phase 52 - The left front tire Now put some hot water in a bowl and sweep the tire there for about 1 minute. this makes the rubber softer and easier to pull over the rim. Then we take the steering knuckle and the brake disc and put them together. From the front we then put on the brake disc cover. Slides the brake cylinder sideways over the brake discs and screws it to an MD04 Screw from behind. Now we can put the brake system and the wheel together and with an MD02 screw together screw. It helps to put a drop of oil on the screw so that it can be screwed in more easily. [img]https://up.picr.de/39639207wd.jpeg[/img] [img]https://up.picr.de/39639208ij.jpeg[/img] [img]https://up.picr.de/39639209ll.jpeg[/img] [img]https://up.picr.de/39639210mt.jpeg[/img] [img]https://up.picr.de/39639211ef.jpeg[/img] [img]https://up.picr.de/39639212oy.jpeg[/img] [img]https://up.picr.de/39639213oo.jpeg[/img] [img]https://up.picr.de/39639214ns.jpeg[/img] [img]https://up.picr.de/39639215jn.jpeg[/img] [img]https://up.picr.de/39639217ff.jpeg[/img] [img]https://up.picr.de/39639219kw.jpeg[/img] [img]https://up.picr.de/39639221jm.jpeg[/img] [img]https://up.picr.de/39639222eo.jpeg[/img] [img]https://up.picr.de/39639224ry.jpeg[/img] [img]https://up.picr.de/39639223cc.jpeg[/img] -------------------------------------------------------------------- Construction phase 53 - The right front tire Here, too, you make some hot water in a bowl and lay it put the tire in there for a minute. Then you pull the tire onto the rim. [img]https://up.picr.de/39639226dr.jpeg[/img] [img]https://up.picr.de/39639228jo.jpeg[/img] [img]https://up.picr.de/39639227yh.jpeg[/img] [img]https://up.picr.de/39639229tr.jpeg[/img] ---------------------------------------------------------------------- Construction phase 54 - The muffler and exhaust pipes Put the two halves of the silencer on top of each other and screw both together with two MP01 screws. Do not tighten the screws completely yet, only when you have opened the four exhaust pipes plugged in as shown. Orientate yourself here on the pictures. Insert the two tailpipes with a drop of superglue each. [img]https://up.picr.de/39639231lm.jpeg[/img] [img]https://up.picr.de/39639230yd.jpeg[/img] [img]https://up.picr.de/39639232qr.jpeg[/img] [img]https://up.picr.de/39639235zo.jpeg[/img] [img]https://up.picr.de/39639233lv.jpeg[/img] [img]https://up.picr.de/39639236ue.jpeg[/img] [img]https://up.picr.de/39639237ux.jpeg[/img] [img]https://up.picr.de/39639239ab.jpeg[/img] [img]https://up.picr.de/39639241fj.jpeg[/img] ------------------------------------------------------------- Construction phase 55 - The right front brake disc and steering knuckle Take the steering knuckle and the brake disc and put them together. From the front we then put on the brake disc cover. Slides the brake cylinder sideways over the brake discs and screws it to an MD04 Screw from behind. Now we can put the brake system and the wheel together and with an MD02 screw together screw. It helps to put a drop of oil on the screw so that it can be screwed in more easily. [img]https://up.picr.de/39639240dy.jpeg[/img] [img]https://up.picr.de/39639242vg.jpeg[/img] [img]https://up.picr.de/39639244pe.jpeg[/img] [img]https://up.picr.de/39639243fp.jpeg[/img] [img]https://up.picr.de/39639245ux.jpeg[/img] [img]https://up.picr.de/39639247yx.jpeg[/img] [img]https://up.picr.de/39639246df.jpeg[/img] [img]https://up.picr.de/39639249by.jpeg[/img] ----------------------------------------------------------------- Attaching the front wheels Now take both wheels and the steering linkage in front of you. Mount the steering linkage on the wheel hub as shown in the pictures and screw it onto each one Side with an MD02 screw. Then we put the handlebar on the model. Pay attention to the toothing for the handlebar properly in position. Then insert the wheel hubs into the upper and lower steering knuckles and secure all four with each an MD02 screw. [img]https://up.picr.de/39639250dr.jpeg[/img] [img]https://up.picr.de/39639251re.jpeg[/img] [img]https://up.picr.de/39639252ys.jpeg[/img] [img]https://up.picr.de/39639253do.jpeg[/img] [img]https://up.picr.de/39639254gy.jpeg[/img]
  4. I will be happy to continue the construction report in this forum when the BB codes work again. Until then you can find my construction progress in these forums: https://www.wettringer-modellbauforum.de/forum/index.php?page=Thread&threadID=70019 https://www.der-lustige-modellbauer.com/t32633-gt500-super-snake-agora-models-18 http://www.partworkmodels.co.uk/phpBB3/viewtopic.php?f=202&t=9157
  5. Hi Mario, wie das anders geht weis ich. Aber ich poste den Beitrag in 5 anderen Foren auch noch. Wenn das hier nun nicht mehr geht, ist mein Bautagebuch in diesem Forum leider beendet. Über 60 Bilder einzeln rein zubringen ist zuviel arbeit, so viel Zeit hab ich nicht. LG Sascha
  6. Only Test! [img]https://up.picr.de/39608686mb.jpeg[/img]
  7. Hi, it doesn't work yet. The forum does not recognize the BB codes. All of my images are hosted externally. The only strange thing is that the old posts from me work, only the new ones don't.
  8. Construction phase 39 - Interior details It continues with the interior of our SuperSnake. Take the first front doormat and insert it as shown. Presses this firmly. The second front doormat and both of them follow in the same way rear. Then we put the seats on the floor and screw them with two each MP01 screws from below. We insert the belt buckles as shown. Now assemble the fire extinguisher and then put it between the two seats.
  9. What is wrong here? Why are the images no longer displayed?
  10. Construction phase 40 - The rear seat bracket Leads the bracket to the floor from below and screw both with 4 screws MP01.
  11. Construction phase 39 - Interior details It continues with the interior of our SuperSnake. Take the first front doormat and insert it as shown. Presses this firmly. The second front doormat and both of them follow in the same way rear. Then we put the seats on the floor and screw them with two each MP01 screws from below. We insert the belt buckles as shown. Now assemble the fire extinguisher and then put it between the two seats.
  12. Construction phase 38 - The rear floor and straps First, we insert both belt buckles into the back floor. then we put the rear floor on the front and screw both with four MP01 screws. Then guide the straps through the floor as shown and fix them from below.
  13. Construction phase 37 - The dashboard (3) First insert the radio into the dashboard and secure it with two MP01 screws. Then you take the watch and insert the dial. Then you insert the pane of glass. Now mount the front part of the clock and screw everything together with an MP05 screw. The clock is then inserted into the dashboard and secured with an MP05 screw. Now insert the back part of the glove compartment and screw it down with three MP01 screws. From the inside we are now assembling the flap of the glove compartment. Finally we mount the dashboard on the floor with two MP03 screws.
  14. Construction phase 36 - The dashboard (2) Now get the dashboard again in front of us and insert the stickers. Then you take the first chrome strip and insert the speedometer glasses. Now leads the first chrome strip onto the dashboard. Then you put the second chrome strip. Then screw the strips from behind with three screws MP01. Then stick the Shelby logo on the base and insert it into the dashboard. You screw this from behind with two MP05 screws.
  15. Construction phase 35 - dashboard and cover of the fuse box Take the cover of the fuse box and place it on the dashboard. Screw this from behind with an MP03 screw.
  16. Construction phase 34 - The pedals and microswitches first we put the two side parts on the floor and screw them together with two MP01 and an MP03 screw. Then we put the two microswitches in the bracket and mount them on the floor. We'll use an MP01 screw for this. Now we insert the pedals from above and fasten them with two MP01 screws. The accelerator pedal and brake pedal should now operate both microswitches.
  17. Stage 32 - The floor and the gear lever Put the shift lever on the floor from above and screw both with an MP01 screw.
  18. Construction phase 32 - The upper wishbone Take a bracket and a wishbone and put them together, push a step through the holes. We assemble the other wishbone in the same way. Then mount the wishbones on the chassis with two MD06 screws each.
  19. Construction phase 31 - stabilizers and wheel suspension Attaches the stabilizers to the front chassis from below. Fix it from above with two screws MP03. Use a pin on each of the suspension. So the wheel suspension remains mobile. Finally, we insert the handlebars as shown. Secure this with some paper tape provisionally.
  20. Construction phase 30 - wheel suspension and steering Now mount both brackets of the wheel suspension on the chassis and fasten them with it one MD06 screw each. Then we put the steering gear on the chassis and screw it to an MP01 Screw. Now we take the steering linkage again and put the steering arm on. Attach this with an MD02 screw. Make sure that the steering arm remains movable.
  21. Construction phase 29 - The handlebars Align the handlebars as you can see in the pictures and screw all three together with two screws MD02. Make sure that the handlebars remain flexible.
  22. Construction phase 28 - fender splash guard Now we mount a splash guard on the front chassis at the fender. Insert these as you can see and screw both with two screws each MD06.
  23. Construction phase 27 - The front chassis Now guide the front chassis to the middle chassis and screw both with screws MD06.
  24. Construction phase 26 - transmission and cross member Now insert the gearbox on the middle chassis and fasten it with two MP01 screws. We now also put the cross member on top of the gearbox and fasten it with it two screws type MP01.
  25. Construction phase 25 - the cardan shaft We now put both halves of the cardan shaft together and screw both together three MP02 screws. Then we insert the cardan shaft into the rear differential and insert the holding points into the chassis. Screw both with two MP01 screws.
×
×
  • Create New...