Jump to content

Levelord

AgoraPro
  • Posts

    55
  • Joined

  • Last visited

  • Days Won

    1

Posts posted by Levelord

  1. Construction phase 65 - The cooler (1)


    Now it goes to the engine. First take the cooler and put the grille on it from the front.
    Then the fan wheel is inserted from the front and fastened from the rear with an MP01 screw.

    [img]https://up.picr.de/40380309ws.jpeg[/img]

    [img]https://up.picr.de/40380318zh.jpeg[/img]

    [img]https://up.picr.de/40380320qm.jpeg[/img]

    [img]https://up.picr.de/40380322sm.jpeg[/img]

    [img]https://up.picr.de/40380321lp.jpeg[/img]

    -----------------------------------------------------------------------------------------------

    Construction phase 66 - cooler housing and fan wheel


    Now place the cooler housing on the cooler from the front and screw it with four MP01 screws.

    [img]https://up.picr.de/40380324sx.jpeg[/img]

    [img]https://up.picr.de/40380326kr.jpeg[/img]

    [img]https://up.picr.de/40380329qj.jpeg[/img]

    [img]https://up.picr.de/40380327yf.jpeg[/img]


    --------------------------------------------------------------------------------------------------

    Construction phase 67 - Front radiator

    Now put the cover for the coolant on the top of the cooler and fasten it with a
    MP02 screw.
    The upper part is then plugged into the component made of BP66. The front half of the cooler is now also plugged in
    and screwed together with the grille.

    [img]https://up.picr.de/40380345hn.jpeg[/img]

    [img]https://up.picr.de/40380349xs.jpeg[/img]

    [img]https://up.picr.de/40380353la.jpeg[/img]

    [img]https://up.picr.de/40380352jk.jpeg[/img]

    [img]https://up.picr.de/40380354xl.jpeg[/img]

    [img]https://up.picr.de/40380355gf.jpeg[/img]

    [img]https://up.picr.de/40380367vx.jpeg[/img]

    [img]https://up.picr.de/40380360jv.jpeg[/img]

    [img]https://up.picr.de/40380364wz.jpeg[/img]


    -------------------------------------------------------------------------------------------------

    Construction phase 68 - The engine (1)

    At the base of the air filter we insert the air filter into the groove and then guide the upper part
    of the air filter on it. Screwed everything together with two MP01 screws.
    Now place the carburetor on the air filter from below and mount it with two MP01 screws.
    Now guide the assembly onto the cylinder head and screw both from the inside.
    The valve covers are then placed on the side and screwed together with two MD06 screws each.

    [img]https://up.picr.de/40380370db.jpeg[/img]

    [img]https://up.picr.de/40380372gt.jpeg[/img]

    [img]https://up.picr.de/40380373gg.jpeg[/img]

    [img]https://up.picr.de/40380374ri.jpeg[/img]

    [img]https://up.picr.de/40380375wv.jpeg[/img]

    [img]https://up.picr.de/40380377lw.jpeg[/img]

    [img]https://up.picr.de/40380383ht.jpeg[/img]

    [img]https://up.picr.de/40380385mg.jpeg[/img]

    [img]https://up.picr.de/40380386lu.jpeg[/img]

    [img]https://up.picr.de/40380387ew.jpeg[/img]

    [img]https://up.picr.de/40380388rg.jpeg[/img]

    [img]https://up.picr.de/40380390qg.jpeg[/img]


    ------------------------------------------------------------------------------------------------------

    Construction phase 69 - The engine (2)

    Now insert the bracket into the housing and screw it in with two MD06 screws.
    We then plug in the short tube at the top of the housing.
    Then we take the blue pressure pump and put it on the mounting plate. Then mount the retaining plate
    on the right of the case, for this we use an MP01 screw.

    [img]https://up.picr.de/40380392am.jpeg[/img]

    [img]https://up.picr.de/40380398tc.jpeg[/img]

    [img]https://up.picr.de/40380404jg.jpeg[/img]

    [img]https://up.picr.de/40380405nn.jpeg[/img]

    [img]https://up.picr.de/40380406uc.jpeg[/img]

    [img]https://up.picr.de/40380409dv.jpeg[/img]

    [img]https://up.picr.de/40380411jk.jpeg[/img]

    [img]https://up.picr.de/40380414wq.jpeg[/img]

    [img]https://up.picr.de/40380416xd.jpeg[/img]

    [img]https://up.picr.de/40380417zh.jpeg[/img]

    [img]https://up.picr.de/40380419oy.jpeg[/img]

    -------------------------------------------------------------------------------------------------------

    Construction phase 70 - The engine (3)

    Now put the two halves of the generator together. We also put the two halves of the radiator hose
    on each other.
    Then mount the generator on the front housing.
    From the front we then put the pulleys on the housing and then the fan wheel. Screws the fan wheel
    from the inside with an MP01 screw.
    We attach the radiator hose to the top of the radiator.

    [img]https://up.picr.de/40380442gx.jpeg[/img]

    [img]https://up.picr.de/40380443ng.jpeg[/img]

    [img]https://up.picr.de/40380444hq.jpeg[/img]

    [img]https://up.picr.de/40380446cn.jpeg[/img]

    [img]https://up.picr.de/40380449bj.jpeg[/img]

    [img]https://up.picr.de/40380453fp.jpeg[/img]

    [img]https://up.picr.de/40380458sv.jpeg[/img]

    [img]https://up.picr.de/40380462cm.jpeg[/img]

    [img]https://up.picr.de/40380465dd.jpeg[/img]

    [img]https://up.picr.de/40380466vq.jpeg[/img]

    [img]https://up.picr.de/40380467kv.jpeg[/img]

    [img]https://up.picr.de/40380468cn.jpeg[/img]

    [img]https://up.picr.de/40380470tn.jpeg[/img]

    [img]https://up.picr.de/40380471fa.jpeg[/img]

    -------------------------------------------------------------------------------------------------------

    Construction phase 71 - The engine (4)

    First mount the exhaust filter on the right engine block. Then take the exhaust manifold and plug the four
    Exhaust pipes as designated a.
    Now the light switch for the model is inserted from behind and with the mounting plate and a screw
    MP03 attached.

    [img]https://up.picr.de/40380473wx.jpeg[/img]

    [img]https://up.picr.de/40380482gg.jpeg[/img]

    [img]https://up.picr.de/40380490pj.jpeg[/img]

    [img]https://up.picr.de/40380491kh.jpeg[/img]

    [img]https://up.picr.de/40380492ld.jpeg[/img]

    [img]https://up.picr.de/40380493cl.jpeg[/img]

    [img]https://up.picr.de/40380494is.jpeg[/img]

    [img]https://up.picr.de/40380495bs.jpeg[/img]

    [img]https://up.picr.de/40380497wp.jpeg[/img]

    [img]https://up.picr.de/40380498lz.jpeg[/img]


    ---------------------------------------------------------------------------------------------------------------

    Construction phase 72 - The engine (5)

    Now take the left exhaust manifold and insert the four exhaust pipes there one after the other.
    Then pull out the assembly with the fan wheel again and plug it into the left engine block.
    The upper part of the gearbox is also plugged into the engine block.
    Now lead the right engine block to the left and screw both halves together with four MD06 screws.
    The exhaust pipes are then inserted on the sides of the engine block as shown.

    At the end of this construction phase, mount the retaining plate on the cooler, this is just clipped on.

    [img]https://up.picr.de/40380510wm.jpeg[/img]

    [img]https://up.picr.de/40380512eb.jpeg[/img]

    [img]https://up.picr.de/40380514nr.jpeg[/img]

    [img]https://up.picr.de/40380518aa.jpeg[/img]

    [img]https://up.picr.de/40380524gi.jpeg[/img]

    [img]https://up.picr.de/40380526pc.jpeg[/img]

    [img]https://up.picr.de/40380528oz.jpeg[/img]

    [img]https://up.picr.de/40380529ko.jpeg[/img]

    [img]https://up.picr.de/40380531tu.jpeg[/img]

    [img]https://up.picr.de/40380532ig.jpeg[/img]

    [img]https://up.picr.de/40380537bs.jpeg[/img]

    [img]https://up.picr.de/40380539kc.jpeg[/img]

    [img]https://up.picr.de/40380541xk.jpeg[/img]

    ---------------------------------------------------------------------------------------------------------------

    Construction phase 73 - The engine (6)

    Now guide the cylinder head to the engine block and insert it.
    The lower engine cover is then put on from below and everything is screwed together with two MD06 screws.
    Then insert the filler neck into the cover and then insert the nozzle on top of the engine.
    The connection cable is then led around the side of the air filter and plugged in at the positions.

    Now we take the components of the oil cooler and put them together. Screwed the small grid with four
    MP07 screws.
    Then plug the oil cooler in front of the cooler.

    [img]https://up.picr.de/40380689qh.jpeg[/img]

    [img]https://up.picr.de/40380691ef.jpeg[/img]

    [img]https://up.picr.de/40380694ww.jpeg[/img]

    [img]https://up.picr.de/40380696wk.jpeg[/img]

    [img]https://up.picr.de/40380697ue.jpeg[/img]

    [img]https://up.picr.de/40380703ok.jpeg[/img]

    [img]https://up.picr.de/40380706nv.jpeg[/img]

    [img]https://up.picr.de/40380714tb.jpeg[/img]

    [img]https://up.picr.de/40380717pk.jpeg[/img]

    [img]https://up.picr.de/40380720dm.jpeg[/img]

    [img]https://up.picr.de/40380737jl.jpeg[/img]

    [img]https://up.picr.de/40380742gv.jpeg[/img]

    [img]https://up.picr.de/40380744tb.jpeg[/img]

    [img]https://up.picr.de/40380751og.jpeg[/img]

    [img]https://up.picr.de/40380755en.jpeg[/img]

    [img]https://up.picr.de/40380756ym.jpeg[/img]

  2. Construction phase 56 - Rear left shock absorber and brake

    Take the cylinder of the shock absorber and put it in the base plate, fasten both together
    by pushing the pin through the opening to fix it.
    Then we insert the component from below into the chassis at the rear right and screw it together from above
    an MP01 screw.
    We then insert the upper end of the shock absorber into the cylinder and screw it to the
    Leaf spring holder, again with an MP01 screw.

    [img]https://up.picr.de/40349356kh.jpeg[/img]

    [img]https://up.picr.de/40349373ml.jpeg[/img]

    [img]https://up.picr.de/40349353mr.jpeg[/img]

    [img]https://up.picr.de/40349354ur.jpeg[/img]

    [img]https://up.picr.de/40349355zk.jpeg[/img]


    --------------------------------------------------------------------------------------------------------

    Construction phase 57 - The left rear wheel


    Now we heat some water and put the tire there for about 1-2 minutes. SO the rubber becomes softer.
    Take the tire out of the water bath and carefully press the rim into the tire until it is properly seated.

    Turns the wheel around and applies the brake to the wheel hub from behind. Now guide the wheel and brake to the model
    and mounts the wheel on the axle with an MP03 screw.
    Finally, the hub cover is put on.

    [img]https://up.picr.de/40349358bw.jpeg[/img]

    [img]https://up.picr.de/40349361wu.jpeg[/img]

    [img]https://up.picr.de/40349363ou.jpeg[/img]

    [img]https://up.picr.de/40349364gk.jpeg[/img]

    [img]https://up.picr.de/40349365rh.jpeg[/img]

    [img]https://up.picr.de/40349366es.jpeg[/img]

    [img]https://up.picr.de/40349367ql.jpeg[/img]

    [img]https://up.picr.de/40349368zy.jpeg[/img]

    --------------------------------------------------------------------------------------------------------

    Construction phase 58 - Rear right shock absorber and brake


    Now insert the cylinder of the shock absorber into the base plate and fasten both again with the pin.
    Then the component is inserted again from below on the model and from above with an MP01 screw
    screwed.
    Now insert the upper end of the shock absorber into the cylinder and screw it down with an MP03 screw
    on the bracket of the leaf spring.
    We only need the brake when we have finished the right wheel.


    [img]https://up.picr.de/40349370tb.jpeg[/img]

    [img]https://up.picr.de/40349371fa.jpeg[/img]

    [img]https://up.picr.de/40349373ml.jpeg[/img]

    [img]https://up.picr.de/40349372bu.jpeg[/img]

    [img]https://up.picr.de/40349374of.jpeg[/img]

    [img]https://up.picr.de/40349375em.jpeg[/img]

    --------------------------------------------------------------------------------------------------------

    Construction phase 59 - The right rear wheel


    Now briefly heat the tire again in a water bath and then press it onto the rim.
    We put the brake on the wheel hub from behind and then guide the wheel to the model.
    Screw the wheel to the axle with an MP03 screw and finally put the wheel hub on.

    [img]https://up.picr.de/40349360jh.jpeg[/img]

    [img]https://up.picr.de/40349361wu.jpeg[/img]

    [img]https://up.picr.de/40349363ou.jpeg[/img]

    [img]https://up.picr.de/40349376zw.jpeg[/img]

    [img]https://up.picr.de/40349378qp.jpeg[/img]

    [img]https://up.picr.de/40349381gr.jpeg[/img]

    [img]https://up.picr.de/40349382gn.jpeg[/img]

    [img]https://up.picr.de/40349383bw.jpeg[/img]


    ------------------------------------------------------------------------------------------------------

    Construction phase 60 - the exhaust system


    In order to be able to mount the exhaust system, we unfortunately have to dismantle a plate from the chassis.
    For this we remove the necessary screws and put everything aside.
    Then insert the exhaust system made of BP54 from below behind the axle and screw it to the chassis
    six MP01 screws on the chassis.
    Then put the base plate back in and screw it down as usual.
    Now we take the components of this construction phase. First place the halves of the silencer on the appropriate one
    Opposite side and screw them with two MP02 screws each.
    Then attach the exhaust pipes to the chassis from below and insert the ends into the tailpipes.
    Then screw everything to the chassis with four MP01 screws.

    [img]https://up.picr.de/40349384xt.jpeg[/img]

    [img]https://up.picr.de/40349388fg.jpeg[/img]

    [img]https://up.picr.de/40349391mi.jpeg[/img]

    [img]https://up.picr.de/40349394yd.jpeg[/img]

    [img]https://up.picr.de/40349392fo.jpeg[/img]

    [img]https://up.picr.de/40349393qy.jpeg[/img]

    [img]https://up.picr.de/40349395tv.jpeg[/img]

    --------------------------------------------------------------------------------------------------------

    Construction phase 61 - the steering wheel


    Put the handlebar on the pinion and press it tight.
    Now guide the microswitch for the horn into the handlebar cover and press it firmly.
    Place the handlebar in the shaft and lay the cable sideways past it. Now assemble the second half
    the handlebar cover.
    Now press the steering wheel from the front onto the handlebar and mount the horn button.

    [img]https://up.picr.de/40349397fy.jpeg[/img]

    [img]https://up.picr.de/40349400lt.jpeg[/img]

    [img]https://up.picr.de/40349404zf.jpeg[/img]

    [img]https://up.picr.de/40349405si.jpeg[/img]

    [img]https://up.picr.de/40349406qw.jpeg[/img]

    [img]https://up.picr.de/40349407of.jpeg[/img]

    [img]https://up.picr.de/40349409xe.jpeg[/img]

    -----------------------------------------------------------------------------------------------------

    Construction phase 62 - The trunk lining


    There is nothing to build in this construction phase.


    [img]https://up.picr.de/40349412zl.jpeg[/img]


    --------------------------------------------------------------------------------------------------------

    Construction phase 63 - The spare wheel


    First, put the tire briefly in warm water to soften it. Pushes the tire
    then on the rim.

    Now guide the steering wheel through the cockpit from the inside and mount it with the bracket from the rear of the cockpit.
    Aligns the front wheels in the direction of travel and places the pinion of the handlebar on the pinion of the steering.
    Then press the mounting plate onto the pinion.
    Now we mount the interior on the chassis. Screw this with four MP01 screws from below.

    [img]https://up.picr.de/40349410xm.jpeg[/img]

    [img]https://up.picr.de/40349411lt.jpeg[/img]

    [img]https://up.picr.de/40349414uo.jpeg[/img]

    [img]https://up.picr.de/40349416dn.jpeg[/img]

    ----------------------------------------------------------------------------------------------------------

    Construction phase 64 - Spare wheel holder and side parts of the trunk lining


    Now pull out the trunk lining made of BP62 again and attach the side panels to it.
    Now guide the panels onto the model from behind as shown and insert it.

    Now mount the bracket on the spare wheel and then insert it in the rear right in the body.

    [img]https://up.picr.de/40349419oi.jpeg[/img]

    [img]https://up.picr.de/40349420ay.jpeg[/img]

    [img]https://up.picr.de/40349421zp.jpeg[/img]

    [img]https://up.picr.de/40349422kn.jpeg[/img]

    [img]https://up.picr.de/40349423hd.jpeg[/img]

    [img]https://up.picr.de/40349425ez.jpeg[/img]

    [img]https://up.picr.de/40349427sh.jpeg[/img]

    [img]https://up.picr.de/40349426gb.jpeg[/img]

    [img]https://up.picr.de/40349430jv.jpeg[/img]

    [img]https://up.picr.de/40349431qg.jpeg[/img]

    [img]https://up.picr.de/40349432kp.jpeg[/img]

  3. Construction phase 47 - The right rear inside


    Now first mount the ashtray in the inner lining and screw it to one from behind
    MP01 screw. Then the door opener is inserted and also from behind with an MP01 screw
    screwed.
    Now we bring the interior lining up to the model as shown in the pictures and assemble it
    with three MP01 screws.
    Then we insert the foldable backrest into the holes with the pins on the side, as you can see. It recommends
    the screws on a side panel can be easily loosened for insertion and then tightened again.


    [img]https://up.picr.de/39639151bm.jpeg[/img]

    [img]https://up.picr.de/39639152am.jpeg[/img]

    [img]https://up.picr.de/39639153je.jpeg[/img]

    [img]https://up.picr.de/39639154gy.jpeg[/img]

    [img]https://up.picr.de/39639155jv.jpeg[/img]

    [img]https://up.picr.de/39639156qw.jpeg[/img]

    [img]https://up.picr.de/39639157mj.jpeg[/img]

    [img]https://up.picr.de/39639158gp.jpeg[/img]

    [img]https://up.picr.de/39639159zi.jpeg[/img]

    [img]https://up.picr.de/39639161rg.jpeg[/img]


    -------------------------------------------------------------------

    Construction phase 48 - The upper rear inner panel


    First insert the chrome strip and screw it on with two MP01 screws.
    Then we lead the inner lining to the already assembled inner lining
    And screw both together. For this we take two MP01 screws and one
    MP05 screw.

    [img]https://up.picr.de/39639163xb.jpeg[/img]

    [img]https://up.picr.de/39639164vn.jpeg[/img]

    [img]https://up.picr.de/39639165da.jpeg[/img]

    [img]https://up.picr.de/39639166zf.jpeg[/img]

    [img]https://up.picr.de/39639167wb.jpeg[/img]

    [img]https://up.picr.de/39639168iy.jpeg[/img]

    [img]https://up.picr.de/39639169ib.jpeg[/img]

    [img]https://up.picr.de/39639170vw.jpeg[/img]


    -----------------------------------------------------------

    Construction phase 49 - roll bars and belts


    Now take the heater and insert it from behind on the dashboard.
    Screw this with two screws MP01.

    Then you take the straps and insert them into the holders, fold the metal bracket around them
    no longer dissolve.
    Then screw the brackets to the roll bar with one MP05 screw each.
    Then insert the roll bar on the model as shown, paying attention to the alignment of the belts.
    Screws the roll bar to the chassis with two MP05 screws.

    You then pull the open ends of the straps through the floor and fasten the metal bracket with something
    Superglue.
    Now move the belts over the seats.

    [img]https://up.picr.de/39639172mk.jpeg[/img]

    [img]https://up.picr.de/39639173bu.jpeg[/img]

    [img]https://up.picr.de/39639175cb.jpeg[/img]

    [img]https://up.picr.de/39639176ck.jpeg[/img]

    [img]https://up.picr.de/39639177gw.jpeg[/img]

    [img]https://up.picr.de/39639179hl.jpeg[/img]

    [img]https://up.picr.de/39639180gu.jpeg[/img]

    [img]https://up.picr.de/39639181tu.jpeg[/img]

    [img]https://up.picr.de/39639182qb.jpeg[/img]

    [img]https://up.picr.de/39639183fg.jpeg[/img]

    [img]https://up.picr.de/39639185cf.jpeg[/img]

    -------------------------------------------------------------------

    Construction phase 50 - the back seat and seat belts


    Now guide the two good guys with the belt buckles from above through the rear seat bench as shown
    and attach the small metal bracket from below, a little superglue helps here too.
    The other two straps are laid to the side and also attached below.
    Then insert the rear seat bench into the model and carefully press it down. screwed the
    Rear seat from below with four MP01 screws.

    [img]https://up.picr.de/39639186ob.jpeg[/img]

    [img]https://up.picr.de/39639188bl.jpeg[/img]

    [img]https://up.picr.de/39639189ml.jpeg[/img]

    [img]https://up.picr.de/39639191me.jpeg[/img]

    [img]https://up.picr.de/39639192iv.jpeg[/img]

    [img]https://up.picr.de/39639193de.jpeg[/img]

    [img]https://up.picr.de/39639194jx.jpeg[/img]

    [img]https://up.picr.de/39639195ba.jpeg[/img]

    [img]https://up.picr.de/39639196sg.jpeg[/img]

    -------------------------------------------------------------------

    Phase 51 - The rear backrest and platform

    First place the two platform components together and then place them
    on the model. Bolt the platform from below with two MP01 bolts.
    then we insert the brackets of the backrest from above and screw them together
    from below with one MP05 screw each.

    [img]https://up.picr.de/39639197an.jpeg[/img]

    [img]https://up.picr.de/39639198uo.jpeg[/img]

    [img]https://up.picr.de/39639199ow.jpeg[/img]

    [img]https://up.picr.de/39639200hz.jpeg[/img]

    [img]https://up.picr.de/39639201qr.jpeg[/img]

    [img]https://up.picr.de/39639202rd.jpeg[/img]

    [img]https://up.picr.de/39639203zn.jpeg[/img]

    [img]https://up.picr.de/39639204gu.jpeg[/img]

    [img]https://up.picr.de/39639205vn.jpeg[/img]

    [img]https://up.picr.de/39639206cu.jpeg[/img]

    ----------------------------------------------------------------------

    Construction phase 52 - The left front tire

    Now put some hot water in a bowl and sweep the tire there for about 1 minute.
    this makes the rubber softer and easier to pull over the rim.

    Then we take the steering knuckle and the brake disc and put them together.
    From the front we then put on the brake disc cover.
    Slides the brake cylinder sideways over the brake discs and screws it to an MD04
    Screw from behind.
    Now we can put the brake system and the wheel together and with an MD02 screw together
    screw. It helps to put a drop of oil on the screw so that it can be screwed in more easily.

    [img]https://up.picr.de/39639207wd.jpeg[/img]

    [img]https://up.picr.de/39639208ij.jpeg[/img]

    [img]https://up.picr.de/39639209ll.jpeg[/img]

    [img]https://up.picr.de/39639210mt.jpeg[/img]

    [img]https://up.picr.de/39639211ef.jpeg[/img]

    [img]https://up.picr.de/39639212oy.jpeg[/img]

    [img]https://up.picr.de/39639213oo.jpeg[/img]

    [img]https://up.picr.de/39639214ns.jpeg[/img]

    [img]https://up.picr.de/39639215jn.jpeg[/img]

    [img]https://up.picr.de/39639217ff.jpeg[/img]

    [img]https://up.picr.de/39639219kw.jpeg[/img]

    [img]https://up.picr.de/39639221jm.jpeg[/img]

    [img]https://up.picr.de/39639222eo.jpeg[/img]

    [img]https://up.picr.de/39639224ry.jpeg[/img]

    [img]https://up.picr.de/39639223cc.jpeg[/img]

    --------------------------------------------------------------------

    Construction phase 53 - The right front tire

    Here, too, you make some hot water in a bowl and lay it
    put the tire in there for a minute.
    Then you pull the tire onto the rim.

    [img]https://up.picr.de/39639226dr.jpeg[/img]

    [img]https://up.picr.de/39639228jo.jpeg[/img]

    [img]https://up.picr.de/39639227yh.jpeg[/img]

    [img]https://up.picr.de/39639229tr.jpeg[/img]

    ----------------------------------------------------------------------

    Construction phase 54 - The muffler and exhaust pipes

    Put the two halves of the silencer on top of each other and screw both together with two
    MP01 screws. Do not tighten the screws completely yet, only when you have opened the four exhaust pipes
    plugged in as shown. Orientate yourself here on the pictures.
    Insert the two tailpipes with a drop of superglue each.

    [img]https://up.picr.de/39639231lm.jpeg[/img]

    [img]https://up.picr.de/39639230yd.jpeg[/img]

    [img]https://up.picr.de/39639232qr.jpeg[/img]

    [img]https://up.picr.de/39639235zo.jpeg[/img]

    [img]https://up.picr.de/39639233lv.jpeg[/img]

    [img]https://up.picr.de/39639236ue.jpeg[/img]

    [img]https://up.picr.de/39639237ux.jpeg[/img]

    [img]https://up.picr.de/39639239ab.jpeg[/img]

    [img]https://up.picr.de/39639241fj.jpeg[/img]

    -------------------------------------------------------------

    Construction phase 55 - The right front brake disc and steering knuckle

    Take the steering knuckle and the brake disc and put them together.
    From the front we then put on the brake disc cover.
    Slides the brake cylinder sideways over the brake discs and screws it to an MD04
    Screw from behind.
    Now we can put the brake system and the wheel together and with an MD02 screw together
    screw. It helps to put a drop of oil on the screw so that it can be screwed in more easily.

    [img]https://up.picr.de/39639240dy.jpeg[/img]

    [img]https://up.picr.de/39639242vg.jpeg[/img]

    [img]https://up.picr.de/39639244pe.jpeg[/img]

    [img]https://up.picr.de/39639243fp.jpeg[/img]

    [img]https://up.picr.de/39639245ux.jpeg[/img]

    [img]https://up.picr.de/39639247yx.jpeg[/img]

    [img]https://up.picr.de/39639246df.jpeg[/img]

    [img]https://up.picr.de/39639249by.jpeg[/img]

    -----------------------------------------------------------------

    Attaching the front wheels


    Now take both wheels and the steering linkage in front of you.
    Mount the steering linkage on the wheel hub as shown in the pictures and screw it onto each one
    Side with an MD02 screw.
    Then we put the handlebar on the model. Pay attention to the toothing for the handlebar
    properly in position.
    Then insert the wheel hubs into the upper and lower steering knuckles and secure all four with each
    an MD02 screw.

    [img]https://up.picr.de/39639250dr.jpeg[/img]

    [img]https://up.picr.de/39639251re.jpeg[/img]

    [img]https://up.picr.de/39639252ys.jpeg[/img]

    [img]https://up.picr.de/39639253do.jpeg[/img]

    [img]https://up.picr.de/39639254gy.jpeg[/img]

  4. 18 hours ago, Mario´s Schiffsmodellbau said:

    Ist bei mir auch so,

     

    habe jedes Bild einzeln eingefügt.

    Grafikadresse kopieren und dann hier eingefügt.

     

    Gruß Mario

    Hi Mario, wie das anders geht weis ich. Aber ich poste den Beitrag in 5 anderen Foren auch noch. Wenn das hier nun nicht mehr geht, ist mein Bautagebuch in diesem Forum leider beendet. Über 60 Bilder einzeln rein zubringen ist zuviel arbeit, so viel Zeit hab ich nicht.

    LG Sascha

  5. 1 hour ago, admin said:

    Hi, the forum got upgraded over the week-end and seems to have had a couple of glitches. I have refreshed your account - can you try again see if it uploads?

    thanks!

     

    Hi, it doesn't work yet. The forum does not recognize the BB codes. All of my images are hosted externally. The only strange thing is that the old posts from me work, only the new ones don't.

  6. Construction phase 39 - Interior details


    It continues with the interior of our SuperSnake.
    Take the first front doormat and insert it as shown. Presses this
    firmly. The second front doormat and both of them follow in the same way
    rear.
    Then we put the seats on the floor and screw them with two each
    MP01 screws from below.
    We insert the belt buckles as shown.
    Now assemble the fire extinguisher and then put it between the two seats.

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

  7. Construction phase 39 - Interior details


    It continues with the interior of our SuperSnake.
    Take the first front doormat and insert it as shown. Presses this
    firmly. The second front doormat and both of them follow in the same way
    rear.
    Then we put the seats on the floor and screw them with two each
    MP01 screws from below.
    We insert the belt buckles as shown.
    Now assemble the fire extinguisher and then put it between the two seats.

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

    spacer.png

  8. Construction phase 37 - The dashboard (3)


    First insert the radio into the dashboard and secure it with two MP01 screws.
    Then you take the watch and insert the dial. Then you insert the pane of glass.
    Now mount the front part of the clock and screw everything together with an MP05 screw.
    The clock is then inserted into the dashboard and secured with an MP05 screw.
    Now insert the back part of the glove compartment and screw it down with three MP01 screws.
    From the inside we are now assembling the flap of the glove compartment.

    Finally we mount the dashboard on the floor with two MP03 screws.

    39446286bo.jpeg

    39446288uo.jpeg

    39446287nj.jpeg

    39446289zr.jpeg

    39446291nf.jpeg

    39446290rb.jpeg

    39446292of.jpeg

    39446294pf.jpeg

    39446293ge.jpeg

    39446295ej.jpeg

    39446296lh.jpeg

    39446297gu.jpeg

  9. Construction phase 36 - The dashboard (2)


    Now get the dashboard again in front of us and insert the stickers.
    Then you take the first chrome strip and insert the speedometer glasses.
    Now leads the first chrome strip onto the dashboard. Then you put the
    second chrome strip.
    Then screw the strips from behind with three screws MP01.
    Then stick the Shelby logo on the base and insert it into the dashboard.
    You screw this from behind with two MP05 screws.

    39446277qs.jpeg

    39446276yr.jpeg

    39446278xn.jpeg

    39446279nl.jpeg

    39446280vg.jpeg

    39446281ks.jpeg

    39446282eu.jpeg

    39446284kg.jpeg

    39446283jv.jpeg

  10. Construction phase 34 - The pedals and microswitches


    first we put the two side parts on the floor and screw them together with two
    MP01 and an MP03 screw.
    Then we put the two microswitches in the bracket and mount them on the floor.
    We'll use an MP01 screw for this.
    Now we insert the pedals from above and fasten them with two MP01 screws.
    The accelerator pedal and brake pedal should now operate both microswitches.


    39446259xf.jpeg

    39446260gl.jpeg

    39446261hk.jpeg

    39446263eu.jpeg

    39446264ho.jpeg

    39446266as.jpeg

    39446267kt.jpeg

    39446268xh.jpeg

  11. Construction phase 30 - wheel suspension and steering


    Now mount both brackets of the wheel suspension on the chassis and fasten them with it
    one MD06 screw each.
    Then we put the steering gear on the chassis and screw it to an MP01
    Screw.
    Now we take the steering linkage again and put the steering arm on. Attach this
    with an MD02 screw. Make sure that the steering arm remains movable.


    39279839dy.jpeg

    39279842ny.jpeg

    39279843lb.jpeg

    39279845wr.jpeg

    39279846cz.jpeg

    39279847rs.jpeg

    39279848kv.jpeg

    39279853fq.jpeg

    39279850cc.jpeg

    39279851ay.jpeg

    39279856vq.jpeg

×
×
  • Create New...