Jump to content

Titanic Pack 16 - Stage 91. Bridge deck bulkheads.


Recommended Posts

  • Administrator

Stage 91 gives us some more bulkheads for the bridge deck.

P7240015.thumb.JPG.56dfa1c493b868c3c3898a93022ec8ac.JPG

Now we have some more window frames for glue to the bulkheads.  Not too many this time!

P7240016.thumb.JPG.ed3733cd83db163bcafe0475a06a8327.JPG

P7240017.thumb.JPG.6821cf115dc324e81027514589eb6e45.JPG

Screw teh three connectors to the side bulkhead.

P7240019.thumb.JPG.1dd28ab9a525110361fce5155a0bfa7d.JPG

Screw this in place on the bridge deck.

P7240021.thumb.JPG.9720166d5994e624eabc84a90b605568.JPG

It looks like this from the pretty side.

P7240022.thumb.JPG.58c6e2ee3b4c25ad4cb309401a03bf68.JPG

Screw the four connectors for the aft bulkhead.

P7240020.thumb.JPG.5c143fe1033b924362fa1e10fee0bd06.JPG

Screw this to the bridge deck.

P7240023.thumb.JPG.a741d8738b6620e2bde0684fb6d00241.JPG

Glue the two ventilators in place.  

P7240024.thumb.JPG.173fb6a47139d12a190cbcc9dc4d9fea.JPG

Turn the deck over and fit the LED board.

P7240025.thumb.JPG.8638555ac9be43bb6ec6b88f25d28a26.JPG

This completes the stage.

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...