Jump to content

Bismarck Pack 2 - stage 15


Recommended Posts

Stage 14 - A bit more of the hull and the remaining breakwater hinges.

IMG_7943.thumb.jpg.7ef19054d7df76226fb181a76a069b2b.jpg

 

Nice and easy this first bit, simply screw the tow pieces of hull together:

IMG_7944.thumb.jpg.f9d2de7463dc892f23815160fbda756a.jpgIMG_7945.thumb.jpg.033ef61a201e93b6237152b9edc55e6c.jpg

 

And now I get to the second half of the breakwater pins; so a little more fiddly!

One word of caution, I found that my turret was locked into place (following the motor attachment in the previous stage 14), and the guns were over the area that I wanted to work on, so you may find it easier to detach the motor, put the pins in place and then reattach the motor.

As with the earlier port-side hinges and pins, I preferred to snip them all of and prepare them in one go.

IMG_7946.thumb.jpg.4e88db6e8248641e1e68162954b0d30d.jpgIMG_7947.thumb.jpg.7468c2dd0128ae380b223cea00e07725.jpg

 

And that is stage 15 completed I'm loving the deck detail!

IMG_7948.thumb.jpg.74f00f7cb8dfbcf90cf8275c31c3bfd0.jpg

IMG_7949.jpg

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...