Jump to content

Bismarck Pack 1 – Stage 5


Recommended Posts

Stage 5: Starting the anchors with the capstans and anchor chains

IMG_7352.thumb.jpg.1ad4d7e41d97309b8feee86e06ccd64e.jpg

As for stage 4, we begin by fixing another connector to the hull section.

IMG_7353.thumb.jpg.7064829bcf99a8f7fc00cc63286a38a7.jpg

Then we add some parts to the upper deck.

I test-fitted the two anchor chain openings and two chain guards before gluing them to the upper deck.

IMG_7354.thumb.jpg.825fe7b573d0674afdec2b0e863984f0.jpg

Then to the capstans.

Rather than apply glue to the wheel (as instructed) I applied glue to hole of the shaft before fitting the wheel peg into the shaft. Then turned the shaft 180° and firmly pushed the green drum and the support down the shaft as far as they could go. The process was repeated for the red capstan.

IMG_7355.thumb.jpg.9551dcb819c07f33a9fba5ce48df9fb6.jpgIMG_7357.thumb.jpg.72328be41fc3417f90bb67e15d4a4d84.jpgIMG_7358.thumb.jpg.4549d7a29f93238461cca84371477b61.jpgIMG_7363.thumb.jpg.f9cd5cea671570deb97c48387b57779b.jpg

Stage 5 complete!

IMG_7364.thumb.jpg.2e62dd0cdc4d3c7e9a1c645b2fe0f958.jpg

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...