Jump to content

Recommended Posts

Posted

This stage starts to make it look like a car!

53.jpg.b7df405dd84130a70cbebe01d13e7fc0.jpg

 

We start by adding the handbrake cable spring to the frame. Insert the U shaped end into the hole on the right side of the chassis frame. In step 2, the floor is fit into position and fixed into place with 4x IP screws.

55.jpg.455067b05ce9bfab8534ceed4c407207.jpg

54.jpg.23ff6a15053cd646d87af4c19d9b3fd5.jpg

Step 4 is adding the handbrake assembly. Secure the handbrake cable with another IP screw. Insert the V shaped end of the spring into the handbrake cable assembly prior to screwing the assembly into place. Lastly, in Step 5, the handbrake cable bushing is pressed into place over the end of the handbrake cable.

56.jpg.c926404b71367b570d2178ea3083b583.jpg

Another quick stage!

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...