Jump to content

Recommended Posts

Posted

This is a quick stage!

 

Start by adding the 4 brackets to the frame using 8 DM screws. These will need lubricated as they are very tight.

49.jpg.b0eef9dc6c1b3b7ad82ac18afb0552f7.jpg50.jpg.622af0da47ad7c2c3007070980ec606a.jpg

Step 3 is adding the frame to the front chassis. You’ll need 4 HM screws for this.

52.jpg.571192017faa5c0f636e10a7986dbef6.jpg

Lastly, locate the two clips that are cast onto the frame, and press the brake hose into place. Leave the loose ends roughly equal.

51.jpg.7cf18c8db8396aeb80716bf6bd646036.jpg

This wraps up stage 21.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...