Jump to content

Pak 2 - stage 13. Continuing with the engine.


Recommended Posts

  • Administrator

Stager 13 gives us some cowl flaps and exhaust pipes.

P5240169.thumb.JPG.de450b52ac5ba3185f4b3d4cbfd463c0.JPG

Sort the flaps into order and place them on the frame that was supplied in stage 4.

P5240170.thumb.JPG.e4f3e0a86ea7d04c0ba6cd884e53dc77.JPG

Place the retaining bracket over the hinges and screw it in place.

P5240171.thumb.JPG.cf437c61d6251c3b0058d8f21563c9b2.JPG

The last flap doesn't move so is glued in place.  I folder the adjacent flap to its closed position to help align it accurately.

P5240172.thumb.JPG.656b078aa189814c37e9aaf86dc71661.JPG

P5240173.thumb.JPG.9d4177060e0f6c7543919defc6e6e8de.JPG

That completes this stage.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...