Jump to content

T-800 Terminator Pack 2 - Stage 17


Recommended Posts

Stage 17, head sides:

Picture1.jpg.798e59e21e4370de83856218c0364e11.jpg

 

The right side of the head is from stage 09. I attach it with two PM 4mm screws. Then I do the same for the left side:

Picture2.thumb.png.1a9866628b9b5e73e071ab8ae5d413ec.png

 

Now I attach the three ball joints to the hand with the other set of screws provided:

Picture3.thumb.png.b9616c38fdd2fcb803b785e6d8cfcc49.png

 

Stage complete

Picture4.thumb.jpg.962dc583bc6e595a5221801bdbb0529f.jpg

 

Link to comment
Share on other sites

I'd recommend doing a test-fit of the faceplate (Part 1-1) once both sides of the head are attached to the top (Stage 17-3). It turned out that, for me, the slot on the left side of the faceplate was too narrow to fit snugly to the notch on the left side of the head. Required a little filing to open it up a bit. I'm sure you'll appreciate it if you do this now, rather than discover it later.

  • Thanks 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...