Jump to content

T-800 Terminator Pack 2 - Stage 11


Recommended Posts

Lots to do in pack 2, starting off with the jaw:

Picture6.thumb.jpg.6a23297446964b1699513d3f16579868.jpg

 

Firstly, I fit the two neck joint pieces together and screw together with a PB 2x6mm screw (the smaller screw):

Picture7.thumb.png.83fd1642cca78c832a5cf0d7e801d316.png

 

Next, I grab the head motor joint from stage 7 and place each end on the jaw:

Picture8.thumb.png.96212efac43ff5980b743feca726420a.png

 

Now I grab the lower jaw piece from stage 5 and put it in place between the head motor joint. Then I put the 2 brass bushes in along with 2 of the long screws to hold it all together:

Picture9.thumb.png.1cd5b9a20922758e8997d228581cefec.png

 

Stage complete

Picture10.thumb.jpg.717150c2a187430e4e67b6a566252e82.jpg

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...