Jump to content
Levelord

Levelord´s Super Snake @ WinsenRacers

Recommended Posts

Construction phase 23 - The middle chassis

Now we get the middle chassis delivered, attach it to the as shownrear chassis and screw both with four MD06 screws.
It is advisable to put a drop of oil on the screws.


39279613xm.jpeg

39279619zu.jpeg

39279615cu.jpeg

39279620rv.jpeg

39279621dm.jpeg

Share this post


Link to post
Share on other sites

Construction phase 24 - The front floor pan


Take the floor pan and insert it into the middle chassis as shown.
Fasten both with a type MP03 screw at the front. Then insert the four MD02 screws from the side.
For the rest of the fastening we use four MD06 screws.


39279622sk.jpeg

39279624er.jpeg

39279629ar.jpeg

39279638qv.jpeg

39279644tu.jpeg

39279645iv.jpeg

39279647xe.jpeg

39279649lg.jpeg

39279658pm.jpeg

Share this post


Link to post
Share on other sites

Construction phase 25 - the cardan shaft


We now put both halves of the cardan shaft together and screw both together
three MP02 screws.
Then we insert the cardan shaft into the rear differential and insert the holding points into the chassis.
Screw both with two MP01 screws.


39279673iw.jpeg

39279689my.jpeg

39279702tj.jpeg

39279707qh.jpeg

39279708xz.jpeg

39279711sg.jpeg

39279713xl.jpeg

Share this post


Link to post
Share on other sites

Construction phase 26 - transmission and cross member


Now insert the gearbox on the middle chassis and fasten it with two
MP01 screws.
We now also put the cross member on top of the gearbox and fasten it with it
two screws type MP01.


39279716kw.jpeg

39279720xm.jpeg

39279722mp.jpeg

39279723sm.jpeg

39279726mz.jpeg

39279724tg.jpeg

39279728no.jpeg

39279736ti.jpeg

Share this post


Link to post
Share on other sites

Construction phase 27 - The front chassis


Now guide the front chassis to the middle chassis and screw both with screws
MD06.


39279741fh.jpeg

39279745kb.jpeg

39279748su.jpeg

39279751dg.jpeg

39279757av.jpeg

Share this post


Link to post
Share on other sites

Construction phase 28 - fender splash guard


Now we mount a splash guard on the front chassis at the fender.
Insert these as you can see and screw both with two screws each
MD06.


39279768vq.jpeg

39279775dt.jpeg

39279781nq.jpeg

39279784en.jpeg

39279788mi.jpeg

Share this post


Link to post
Share on other sites

Construction phase 29 - The handlebars


Align the handlebars as you can see in the pictures and screw all three together
with two screws MD02.
Make sure that the handlebars remain flexible.


39279791pz.jpeg

39279795dh.jpeg

39279802nb.jpeg

39279814ru.jpeg

39279824hv.jpeg

39279833ok.jpeg

39279834fx.jpeg

Share this post


Link to post
Share on other sites

Construction phase 30 - wheel suspension and steering


Now mount both brackets of the wheel suspension on the chassis and fasten them with it
one MD06 screw each.
Then we put the steering gear on the chassis and screw it to an MP01
Screw.
Now we take the steering linkage again and put the steering arm on. Attach this
with an MD02 screw. Make sure that the steering arm remains movable.


39279839dy.jpeg

39279842ny.jpeg

39279843lb.jpeg

39279845wr.jpeg

39279846cz.jpeg

39279847rs.jpeg

39279848kv.jpeg

39279853fq.jpeg

39279850cc.jpeg

39279851ay.jpeg

39279856vq.jpeg

Share this post


Link to post
Share on other sites

Construction phase 31 - stabilizers and wheel suspension

 

Attaches the stabilizers to the front chassis from below. Fix it from above with two screws
MP03.
Use a pin on each of the suspension. So the wheel suspension remains mobile.

Finally, we insert the handlebars as shown. Secure this with some paper tape
provisionally.


39446241yj.jpeg

39446242wt.jpeg

39446243jv.jpeg

39446244db.jpeg

39446245qs.jpeg

39446246jk.jpeg

Share this post


Link to post
Share on other sites

Construction phase 32 - The upper wishbone


Take a bracket and a wishbone and put them together, push a step through
the holes. We assemble the other wishbone in the same way.
Then mount the wishbones on the chassis with two MD06 screws each.

39446247pr.jpeg

39446248qx.jpeg

39446249gw.jpeg

39446250gt.jpeg

39446251yo.jpeg

39446252aw.jpeg

39446253jf.jpeg

Share this post


Link to post
Share on other sites

Stage 32 - The floor and the gear lever


Put the shift lever on the floor from above and screw both with an MP01 screw.

39446254vo.jpeg

39446256mh.jpeg

39446257hs.jpeg

39446258yf.jpeg

Share this post


Link to post
Share on other sites

Construction phase 34 - The pedals and microswitches


first we put the two side parts on the floor and screw them together with two
MP01 and an MP03 screw.
Then we put the two microswitches in the bracket and mount them on the floor.
We'll use an MP01 screw for this.
Now we insert the pedals from above and fasten them with two MP01 screws.
The accelerator pedal and brake pedal should now operate both microswitches.


39446259xf.jpeg

39446260gl.jpeg

39446261hk.jpeg

39446263eu.jpeg

39446264ho.jpeg

39446266as.jpeg

39446267kt.jpeg

39446268xh.jpeg

Share this post


Link to post
Share on other sites

Construction phase 35 - dashboard and cover of the fuse box


Take the cover of the fuse box and place it on the dashboard.
Screw this from behind with an MP03 screw.


39446269yp.jpeg

39446273xo.jpeg

39446270yq.jpeg

39446272no.jpeg

39446274mr.jpeg

39446275cf.jpeg

Share this post


Link to post
Share on other sites

Construction phase 36 - The dashboard (2)


Now get the dashboard again in front of us and insert the stickers.
Then you take the first chrome strip and insert the speedometer glasses.
Now leads the first chrome strip onto the dashboard. Then you put the
second chrome strip.
Then screw the strips from behind with three screws MP01.
Then stick the Shelby logo on the base and insert it into the dashboard.
You screw this from behind with two MP05 screws.

39446277qs.jpeg

39446276yr.jpeg

39446278xn.jpeg

39446279nl.jpeg

39446280vg.jpeg

39446281ks.jpeg

39446282eu.jpeg

39446284kg.jpeg

39446283jv.jpeg

Share this post


Link to post
Share on other sites

Construction phase 37 - The dashboard (3)


First insert the radio into the dashboard and secure it with two MP01 screws.
Then you take the watch and insert the dial. Then you insert the pane of glass.
Now mount the front part of the clock and screw everything together with an MP05 screw.
The clock is then inserted into the dashboard and secured with an MP05 screw.
Now insert the back part of the glove compartment and screw it down with three MP01 screws.
From the inside we are now assembling the flap of the glove compartment.

Finally we mount the dashboard on the floor with two MP03 screws.

39446286bo.jpeg

39446288uo.jpeg

39446287nj.jpeg

39446289zr.jpeg

39446291nf.jpeg

39446290rb.jpeg

39446292of.jpeg

39446294pf.jpeg

39446293ge.jpeg

39446295ej.jpeg

39446296lh.jpeg

39446297gu.jpeg

Share this post


Link to post
Share on other sites

Construction phase 38 - The rear floor and straps


First, we insert both belt buckles into the back floor.
then we put the rear floor on the front and screw both
with four MP01 screws.
Then guide the straps through the floor as shown and fix them from below.

39446298zq.jpeg

39446299nh.jpeg

39446301ku.jpeg

39446303sb.jpeg

39446305rt.jpeg

39446304vg.jpeg

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...